Acrow Global Limited (trading as Mabey Bridge)

The Bengu Bridge.

Bengu, Thabane and Tsomo Bridges, South Africa

The 13 bay, 39m Tsomo bridge was the first to be installed and took just three days to install. On completion, the installation components were transferred for re-use at the Bengu Bridge site.
The Bengu Bridge, at 62m, was the longest of the three bridges, and featured two equal spans.
The final 2-span, 52m Thabane Bridge was also installed across a very steep valley in the Drakensburg mountains, Free State.
The installation of the three bridges in the East Cape and Free Sate Provinces has had a positive effect on local communities. Children can safely reach schools, families can access markets and healthcare, and workers can more easily go about their day-to-day business.
The capacity of the bridges means they are ‘future-proof’, so whilst they were originally installed to enable pedestrian crossing, they are also capable of carrying vehicular traffic in keeping with the Province’s plans for future road infrastructure development.

https://www.mabey.com/int/en/projects/bengu-thabane-and-tsomo-bridges-south-africa

The Tsomo Bridge in position.

Launching the Tsomo Bridge.

Company details

Incorporated:
08 October 2001
Industry:
Construction