INCINER8 LIMITED

An i8-1000 incinerator installed in a warehouse

INCINER8 Provides the Solution for Mounting RDF Problems

We provided our full waste to energy incineration solution by providing the i8-1000, which is the largest incinerator in our range, with a burn rate of >500kg per hour and sharing the same design characteristic of our entire product range – simple and efficient operation, state of the art, utilizing continuous loading systems which allow for a completely enclosed operation along with cutting-edge pollution control devices in the form of ceramic filtration, to reduce emissions in-line with EU / UK regulations.

Our incinerator solutions are transport all over the world.

Company details

Incorporated:
14 August 2003
Industry:
Renewable energy