This section isCase study
Accommodation Modifications on Live FPSO in Ghana

A small section of the refurbished Mess Room showing new walls, floors and furniture.
Various PLQ Accommodation Modifications onboard a live FPSO in Ghana.
Galley - Remove, rearrange and replace all catering equipment and fabricated stainless steel furniture. Plumbing and electrical services were configured to suit the new layout. Remove and replace the A60 floor and install a new trough style surface drainage system.
Mess - To improve personnel flow at peak meal times and increase seating a new table/seating and catering equipment arrangement was designed, supplied and installed. The flooring was replaced with Amtico vinyl tiles and the walls were decorated with Altro hygienic PVC wall paneling.
51 Cabins - Install B15 acoustic wall liner panels and deep clean floor coverings. Install new furniture including double and single bunks with drawers and curtains, lockers, bedside desks, shelving and chairs. Replace all wet room accessories, remedial works to the ceramic floor tiles and door frames and replace 35 doors. Reconfigure electrics to suit.
