This section isCase study
Tunnel Peru
Tunnel entrance Arequipa Peru
Hanscomb InterContinental's dispute resolution team assisted a contractor in Peru secure time and cost from the employer on the construction of a services tunnel.
The client changed the basis from a construction based contract to that of design and construct contract. Our team prepared time and cost submissions that recovered acceleration costs, secured extensions of time as well as defeat the levying of liquidated damages. Programing and planning as well as delay analysis was undertaken using Primavera software.
Contact
Website
http://www.hanscombintercontinental.com/
Company details
Incorporated
13 April 2010
Industry
Mechanical electrical and process engineering