This section isCase study
Bjarkoy Bridge

test
The requirement for this project was to find a suitable durable material to be used as permanent formwork on new steel
bridge sections being assembled in Poland. EMJ were contracted to provide Permadec panels of different lengths to
accommodate the variation in shape of the bridge deck at different intervals. This involved the design and manufacture of
310 different 3B.6 panels (4.22m and 2.82m lengths). We also provided 95 skewed panels with different panel lengths
and a total area of 251.6m2.

Contact
Website
http://www.emjplastics.com/index.php
Company details
Incorporated
31 March 1960
Industry
Construction