This section isCase study

Basil's Bar Complex Mustique

The main wastewater treatment plant installed on a firm concrete base ready for backfilling.

The bar was demolished and rebuilt in the same location with a need for up-to-date sanitation.
During the survey work it became evident that the adjacent fisherman village, shops and residences would also benefit from connection to this system.
Ecoprocess designed the drainage layouts for the bar, fisherman's village and associated shops. Due to the topography two sewage lifting pumps were required for efficient distribution of the effluent. Ecoprocess designed, supplied, shipped and commissioned; a bespoke wastewater treatment plant incorporating telemetry alarms and UV disinfection; grease traps and sewage lifting pumps.
Long term benefits
The processed wastewater is being reused locally to irrigate the adjacent flora and fauna. The reuse of the
treated wastewater provides a regular flow of 'free' water which, reduces the ongoing cost and carbon footprint of using expensively produced desalinated water.

Internal of the main bar area during construction


View company profile


Contact

Email company

Website

http://www.ecoprocessengineering.com


Company details

Incorporated

28 August 2015

Industry

Water