You are here: great.gov.uk , Export Opportunities , Search results
Search results
10,000 results found
Opportunities found
Displaying items 26 - 50 of 500 in total
- Germany - Renewal of the Irscher Straße water pipe in Saarburg Provided by Published: 15 April 2024 , Closing date: 08 May 2024
- Ireland - The Provision of School Meals (Lunch Club and Snacks Club) at Archbishop McHale College, Tuam, Co. Galway Provided by Published: 15 March 2024 , Closing date: 08 May 2024
- Bahrain - Supply of Conveyer Belts Provided by Published: 07 April 2024 , Closing date: 08 May 2024
- Bangladesh - Purchase of computer goods[3255101] Provided by Published: 23 April 2024 , Closing date: 08 May 2024
- Germany - Earthworks and road construction Provided by Published: 19 April 2024 , Closing date: 08 May 2024
- Bangladesh - 1.Development of (a) 14 Roshi Bazar (b) Akoter Char Bazar (c) Piajkali Bazar (d) Sadarpur Bazar (e) Krishnapur Bazar (f) Joybangla Bazar (g) Monikhotha Bazar Under Sadarpur Provided by Published: 23 April 2024 , Closing date: 08 May 2024
- United States - Data display group Provided by Published: 08 April 2024 , Closing date: 08 May 2024
- Germany - Refurbishment of school building, Maxim-Gorki-Str. 67, 18106 Rostock - Lot 303 Gable grouting Provided by Published: 10 April 2024 , Closing date: 08 May 2024
- Bangladesh - DM/DEV/GSS/NEW/WD-103 Construction of 5-Storied Academic Building with 5-Storied Foundation including Sanitary Provided by Published: 08 April 2024 , Closing date: 08 May 2024
- Chile - Construction OF lighting for numpay sports club Provided by Published: 18 April 2024 , Closing date: 08 May 2024
- Germany - New construction of a daycare center in Dedesdorf Provided by Published: 22 March 2024 , Closing date: 08 May 2024
- Bangladesh - Construction of 94.274m (3X30.488m) Long PC Girder Bridge (Hatirdia Bridge) Old Bhramopotru River at 42th Km on Mawna-Sreepur-Gosingha-Kapasia-Aral-Sonmania-Hatirdia-Monohordi Road (R-313) Under Gazipur Road Division during the year 2022-2023 [WP-06] Provided by Published: 08 April 2024 , Closing date: 08 May 2024
- Bangladesh - Supply of Brand New Latest Model 2(Two) Nos Chain type Hydraulic Excavator Having minimum 45(Forty-Five) Tons Operating weight with Three Year required consumable under the Project (Package no GD-6) of "Expansion and Modernization of Amin Bazar Sa... Provided by Published: 08 April 2024 , Closing date: 08 May 2024
- Canada - Commercial Kitchen Cleaning Provided by Published: 28 March 2024 , Closing date: 08 May 2024
- United States - 26w-156-design and design services during construction for the activated sludge system upgrade at the 26th ward wrrf Provided by Published: 27 March 2024 , Closing date: 08 May 2024
- Bangladesh - NDRIIP/Barhatta/23-24/BR-01 Part A : Construction of 105.30 m RCC Girder Bridge (Including 45.00 m Arch Bridge with 60.30m viaduct over the Kangsha River)on Netrokona-Barhatta R&H Road Barhatta UP office Near Barhatta Hariyatala Road Via M.. Provided by Published: 08 April 2024 , Closing date: 08 May 2024
- Bangladesh - 1) (Lot No. F-14) Construction Work of RCC Retaining Wall & Footpath at Chowara Bazar Digir East & South Side With Others (Ch. 00 to 52m & Ch. 00 to 20m) Provided by Published: 09 April 2024 , Closing date: 08 May 2024
- Canada - Redevelopment OF the center d'Études collÉgiales de lac-mÉgantic Provided by Published: 08 April 2024 , Closing date: 08 May 2024
- Bangladesh - 1) PW-094: Drain-328: Construcrtion of RCC Drain Start From Gobindhopur Rail Gate to Tomsom Bridge Khal Via Rammala Water Tank (Rammala Road) Provided by Published: 09 April 2024 , Closing date: 08 May 2024
- Germany - Suitability to practice the profession Provided by Published: 07 April 2024 , Closing date: 08 May 2024
- Canada - Invitation to submit an expression OF interest (eoi) Provided by Published: 18 April 2024 , Closing date: 08 May 2024
- Germany - Technical Facility Management (TGM), BLB NRW, Duisburg branch.the TGM of the NL Duisburg is divided into a total of 11 specialized lots.the specialized lots may be subdivided into further lots.for the regional lot 6.2 (metal construction, area ... Provided by Published: 31 December 2023 , Closing date: 08 May 2024
- United States - RFC - 111851-24-02-REBID HVAC Corrections & Controls Upgrade, LFK DHQ Admin Provided by Published: 12 March 2024 , Closing date: 08 May 2024
- Bangladesh - Boot Provided by Published: 10 April 2024 , Closing date: 08 May 2024
- Chile - Formulas supply agreement Provided by Published: 18 April 2024 , Closing date: 08 May 2024