Germany - Turnkey design, delivery and installation of a TAB and VDE-compliant photovoltaic rooftop system with energy storage systemThe PV system to be installed is to be equipped with the necessary fuses and metering devices.
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 12 April 2024
- Opportunity publication date
- 14 March 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Turnkey design, delivery and installation of a TAB and VDE-compliant photovoltaic rooftop system with energy storage systemThe PV system to be installed is to feed into the 400V low-voltage grid of the local grid operator via an electrical distribution system equipped with the necessary fuses and metering devices. The solar power generated should be consumed as much as possible and excess solar power should be fed into the local grid operator's low-voltage grid in accordance with the principle of surplus feed-in. The technical connection conditions must be met by the grid operator and a measurement concept for the photovoltaic system must be submitted after installation. 20% of the energy generated annually may not be fed into the public grid due to the funding conditions for this project. This must be ensured by means of appropriate adjustment or control measures, the exact details of which can be found in the contract.
- Opportunity closing date
- 12 April 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- Sennegemeinde Hövelhof Schloßstraße 14 33161 GERMANY
- Contact
- christine.schultze@hoevelhof.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.