Turkey - Turkey - RTU supply and installation for Renewable Energy Integration Project (REIP)
This is a business opportunity from an overseas buyer. Pitch for the business and explain how your company meets their requirements.
Details
- Opportunity closing date
- 20 June 2016
- Opportunity publication date
- 10 June 2016
- Opportunity type
-
Private Sector and Public Sector
- Industry
- Power
- Enquiries received
- 1
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The Government of Republic of Turkey / Turkish Electricity Transmission Corporation (TEIAS) has received a loan from the International Bank for Reconstruction and Development (The World Bank).
It invites international bidders for:
Supply, installation and commissioning of new 173 Remote Terminal Units (RTUs) at the substations and connection of them to the related Regional Control Centres(RCCs);
Replacement of the 27 existing F4F RTUs with new RTUs to be supplied, installed and commissioned at the substations and connection of them to the related Regional Control Centres (RCCs);
Supply, installation and commissioning of Data Acquisition Panels (DAPs) at the 89 substations and other associated equipment (energy analysers, tap-changer converters, etc.) needed at the substations and performance of all necessary adaptation works at 200 substations;
Supply, installation and commissioning of all necessary communication equipment (modem, converter, router, switch etc.) at RTU and Regional Control Centre/Master RTU sides for connection of the Remote Terminal Units (RTUs) to be delivered within the scope of the project to the related Regional Control Centres/Master RTUs;
Spare parts and training.
Bids must be delivered at or before 14:00 (Turkey local time) on 20 July 2016.
For more information please register below with UKTI Turkey
- Opportunity closing date
- 20 June 2016
- Value of contract
- to be confirmed
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.