France - Tramway line construction work
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 14 March 2019
- Opportunity publication date
- 19 February 2019
- Category
- 45234126, ,
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Lot T-02 concerns a purchase order framework agreement with a minimum amount set at -40% of the nominal amount and a maximum amount set at +30% of the nominal amount.The work on the nominal amount includes in particular (indicative quantities):- the installation of the rights-of-way necessary for platform work and adapted signage and its maintenance throughout the work, (1 right-of-way per platform),- the removal and evacuation of existing station furniture,- the removal and conservation or protection of urban furniture (bicycle parking lots, playground, directional signs, barriers, candelabra),- the removal of trees in connection with platform extensions (12 platform openings),- standard preparatory work:- clearing (250 m2)- construction of pedestrian paths: sidewalk and road crossing, (1 unit),- creation of temporary bus stops, (1 unit),- demolition and excavation work on existing platforms and ramps up to -60 cm under the rail, with protection and conservation of the multitubular, (2 750 m3),- demolition work on roads and pavements affected by the station's right-of-way for platform extensions and widenings (600 m3),- evacuation to the sorting centre of all materials, equipment removed or demolished,- completion of the structural work on reinforced concrete platforms and ramps, including platform walls, foundations for furniture and sign posts (tramway and roadway), (2,350 m3),- the construction of complementary main multitubular (50 mL),- the construction, by crossing the track platform, of secondary multitubulars on inter-dock platforms, (1 crossing per station),- the construction of dry networks for the connection of future station equipment, including modification and connection to existing multitubular chambers and drainage and equipment of the chambers created, (12 km of TPC ducts),- construction of a sewerage network and connection to the existing network including inspection chamber, (25 mL),- installation and adjustment of quayside nosings according to the GDU, (625 mL),- the supply and installation of platform bottom curbs and ramps, particularly of the wheel chasse type, (1,750 mL),- the production of mineral coatings for platforms and ramps made of basalt and granite, including white concrete wake-up strips (2,750 m2),- the modification of pedestrian crossings on the platform crossing each station (movement or creation), (400 m2)- modifications of the platform's road crossings in accordance with the IU installations, (40 m2),- the construction of massive LAC gate structures on piles and micropiles, (6 piles, 4 micropiles),- modifications of GLOs at the station exit (offsets, lowered, (250 mL),- the creation of networks (sheaths, L1T chambers and manholes) on a platform, (400 mL),- the supply, installation and fixing of rail connection boxes for the MANT (negative traction), (1 per station),- the replacement of platform cross drains by water boxes, (2 units),- the connection of the station to the EDF power supply box (road works with road crossings), (1 per station),- the rehabilitation and resumption of road works at the edge of the station (roadway or sidewalk) due to the works and the chambers and equipment off the platform. Lot T-02 bis concerns a framework agreement with purchase orders with a minimum amount set at -40% of the nominal amount and a maximum amount set at +30% of the nominal amount.The work on the nominal amount includes in particular (indicative quantities):- the installation of the rights-of-way necessary for platform work and adapted signage and its maintenance throughout the work, (1 right-of-way per platform),- the removal and evacuation of existing station furniture,- the removal and conservation or protection of street furniture (bicycle parking lots, playground, directional signs, barriers, candelabra),- the removal of trees in connection with platform extensions (12 platform openings),- standard preparatory work:- clearing (250 m2),- construction of pedestrian paths: sidewalk and road crossing, (1 unit),- creation of temporary bus stops, (1 unit),- demolition and excavation work on existing platforms and ramps up to -60 cm under the rail, with protection and conservation of the multitubular, (2 750 m3),- demolition work on roads and pavements affected by the station's right-of-way for platform extensions and widenings (600 m3),- evacuation to the sorting centre of all materials, equipment removed or demolished,- completion of the structural work on reinforced concrete platforms and ramps, including platform walls, foundations for furniture and sign posts (tramway and roadway), (2,350 m3),- the construction of additional main multitubular (50 mL),- the construction, by crossing the track platform, of secondary multitubulars on platforms between platforms, (1 crossing per station),- the construction of dry networks for the connection of future equipment for the station, including modification and connection to existing multitubular chambers and drainage and equipment of the chambers created, (12 km of TPC ducts),- construction of a sewerage network and connection to the existing network including inspection chamber, (25 mL),- installation and adjustment of quayside nosings according to the GDU, (625 mL),- the supply and installation of platform bottom curbs and ramps, particularly of the wheel chasse type, (1,750 mL),- the production of mineral coatings for platforms and ramps made of basalt and granite, including white concrete wake-up strips (2,750 m2),- the modification of pedestrian crossings on the platform crossing each station (movement or creation), (400 m2),- modifications of the platform's road crossings in accordance with the IU installations, (40 m2),- the construction of massive LAC gate structures on piles and micropiles, (6 piles, 4 micropiles),- modifications of GLO at the station exit (offsets, lowered, (250 mL),- the creation of networks (sheaths, L1T chambers and manholes) on a platform, (400 mL),- the supply, installation and fixing of rail connection boxes for the MANT (negative traction), (1 per station),- the replacement of platform cross drains by water boxes, (2 units),- the connection of the station to the EDF power supply box (road works with road crossings), (1 per station),- the rehabilitation and resumption of road works at the edge of the station (roadway or sidewalk) due to the works and the chambers and equipment off the platform.
- Opportunity closing date
- 14 March 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- RATP LAC B916 - 54 quai de la Rapée Paris Cedex 12 75599 France
- Contact
- fabiola-chimene.tougnon@ratp.fr
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.