Germany - The town of Neukirchen-Vluyn is planning to extensively rebuild, renovate and modernize the Niederberg municipal comprehensive school at Tersteegenstraße 85 and 87 in Neukirchen-Vluyn in line with current pedagogical ideas. The aim is to create a...

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 May 2024
Opportunity publication date
28 March 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The town of Neukirchen-Vluyn is planning to extensively rebuild, renovate and modernize the Niederberg municipal comprehensive school at Tersteegenstraße 85 and 87 in Neukirchen-Vluyn in line with current educational ideas. The aim is to refurbish and modernize significant parts of the comprehensive school, which not only meets current construction and operational requirements, but also creates learning islands and recreational areas for an individual and group-oriented learning environment. The disciplines of inclusion and social work play an important role here, as does the consideration of the knowledge gained during the corona pandemic, such as the requirements for the network equipment and the division of the year groups through
targeted partial closures of individual areas. For this purpose, rooms must be relocated and adapted according to requirements. School operations must be maintained during the construction phase. Parts of the building are allocated to the respective year groups. This will allow the needs of the student groups in the relevant year groups to be addressed in a more targeted manner. Even when pandemic-related events are taken into account, dividing up the year groups enables the targeted partial closure of individual areas, while lessons can continue for groups that are not affected. To implement the measure, classrooms will be partially relocated or optimized in their floor plan (enlargement of the room, creation of learning islands). The specialist rooms will also be adapted to the teaching and learning opportunities of the respective year groups. For example, viewing windows and doors are to be installed across all classes in years 5-7. There are also plans to optimize the use of space in the teaching kitchen. This will be brought up to the current state of the art in coordination with the user. By positioning the new teaching kitchens in larger areas, they can also be used as a catering base for events. Formerly located in the remote wing of the building "B", the teaching kitchen will be relocated to the first floor area, wing "G" with a direct connection to the foyer area. Structural measures include: Change to the floor plan layout. Structural interventions, thus complex structural planning in the entire building complex. A (at least visual) wayfinding system is also being considered across all buildings to give people who are not familiar with the area a quick overview of the layout of the building sections and to help them find their way around.
and find their way around. In this context, the Gütersloh model should also be taken into account and brought into a design context with the overall architecture. The comprehensive school area is also to receive an electronic locking system. On the one hand, the requirements must be coordinated with the user and, on the other hand, existing systems at the school center must be taken into account. The refurbishment of the existing buildings B, C and G includes replacing the drinking water network and modernizing the electrics. In addition, the surfaces will be modernized in the form of new wall and
modernized in the form of new wall and floor coverings. In addition, the organization of the classrooms will be adapted to requirements. Small structural interventions, such as breakthroughs, are planned for this purpose. In addition to the roof renovation, a venetian blind system is planned to improve thermal insulation in summer. Building C will also receive an elevator extension to enable barrier-free access. Furthermore, it was determined that the hourly WCs in buildings B, C and G are outdated and in need of renovation. In building C, the toilets in the north wing have therefore been brought forward and are already being renovated. Building
Building G is to be extended with extension J. This comprises 3 storeys, which contain further classrooms and the IT department. The rooms will be accessed from the respective existing floor. An elevator is also planned. The escape route is via an external fire escape on the south side. The extension will be positioned away from Building G so that the classrooms continue to be supplied with light and fresh air. The extension is constructed from reinforced concrete or reinforced concrete hollow core slabs. This allows the rooms to be freely designed using drywalls, which can also be subsequently
can also be changed at a later date should the needs of the school change.

Opportunity closing date
06 May 2024
Value of contract
to be confirmed

About the buyer

Address
Stadt Neukirchen-Vluyn Hans-Böckler-Straße 26 47506 GERMANY
Contact
vergabe@neukirchen-vluyn.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?