Germany - The "New Burghausen Technical Center" construction project is located in the town of Burghau

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
22 January 2025
Opportunity publication date
09 December 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The construction project "New Burghausen Technical Center" is located in the town of Burghausen, Marktler Strasse 45a. It involves clearing the site of old buildings and constructing the new building, including landscaping. This new building is located in the northern part of the town
Salzachzentrum\/Salzachareal and can be reached via B20 - Burgkirchener Straße - Badhöringer Straße from the north or via B20 - Marktler Straße - Robert-Koch-Straße - Badhöringer Straße. The construction site is bordered to the north, east and south by existing buildings.
buildings. During the construction work, the adjacent neighboring buildings are always in use. The eastern outer wall in the basement and ground floor is designed as a boundary development. The outer edge of the building is only about 70 cm in front of the outer edge of the existing neighboring building. The façade of the eastern elevation from floor 1 upwards is constructed above the existing neighboring building. The approximately 27-metre-high chimney with associated steel construction tower of the neighboring heating plant has already been constructed and the neighboring heating plant is in operation. This existing structure interferes with the construction of the new technical center. To operate the heating center, the northern ramp \/ the northern exit must be used regularly by third parties to supply the heating center with consumables and operating materials. Freely accessible truck deliveries from Badhöringer Straße to the neighboring heating center must be ensured by the contractor on an ongoing basis. The existing underground car park in the north-east will be put back into operation by the neighbor during the construction period of the new building.
be put back into operation by the neighbor. Therefore, in addition to the aforementioned truck deliveries, free access to the underground car park via this northern ramp \/ this northern exit must be ensured by the contractor on an ongoing basis. The restrictions resulting from existing traffic
traffic police regulations, such as parking bans, one-way street regulations, payload restrictions or space restrictions. There are two access roads that are opened daily before work begins and must be closed after leaving the construction site. The contractor must secure the construction site during and outside normal working hours in accordance with the accident prevention regulations of the
building trade associations. The construction site entrances must be kept permanently closed, except for operational purposes. The supply and disposal of the construction site takes place with an entrance from Badhöringer Straße onto the BE area. One access road leads to the unloading zone\/delivery lane
between Badhöringer Straße and the new building with one-way traffic regulation. This unloading zone is partly on the road, partly on the construction site and is separated from the road by a construction fence. The second access road is also the exit from the aforementioned unloading zone and leads to the open area north of the new building by the exit ramp for delivery to the basement. In the immediate vicinity and on the construction site
there are only limited turning possibilities. Loading and unloading activities may only be carried out in the presence of the vehicle driver. The Contractor must control all deliveries in such a way that they are only delivered to the construction site when the Contractor's personnel are present to receive, store and keep them safe. The road traffic regulations shall apply throughout the construction site. Compliance with the
road traffic regulations is the responsibility of the contractors and their drivers and machine operators. Notwithstanding this, the maximum speed is set at 20 km\/h.

Opportunity closing date
22 January 2025
Value of contract
to be confirmed

About the buyer

Address
Wirtschaftsbeteiligungsgesellschaft Burghausen mbH