Germany - The construction project is divided into two separate construction phases.

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
27 February 2025
Opportunity publication date
25 January 2025
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The construction project is divided into two separate construction phases (2025 and 2026):; Concrete renovation on various buildings at the wastewater treatment plant (operations building, blower station, technical building, secondary thickener). Substrate preparation of the surfaces (concrete\/masonry) using HDW; blasting. Removal of the paint on reinforced concrete components, examination for hollow or damaged areas,; partial repair of damaged areas, crack repair by grouting, renewal of the; permanently elastic joint material, surface protection OS 5a on all concrete surfaces, renewal of the; paint on the exterior masonry wall; Essential construction work:; Work scaffolding approx. 460 m²; Inspection for defects approx. 510 m²; Surface preparation up to 0.01 m² approx. 100 pcs; Prepare exposed reinforcing steel, length up to 0.5 m, approx. 80 pcs; Install cement mortar, surface up to 0.01 m², thickness up to 3 cm, approx. 60 pcs; Install cement mortar, surface up to 0.01 m², thickness 3 to 5 cm, approx. 100 pcs; Spray mortar in partial areas, approx. 190 m²; HDW blasting, approx. 510 m²

Opportunity closing date
27 February 2025
Value of contract
to be confirmed

About the buyer

Address
Stadtwerke Schifferstadt

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?