Germany - The combined sewage drainage network of the student village in Hürth-Efferen is lower than the public sewer system and requires a pumping station to discharge the combined sewage into the public sewer system....

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
08 May 2024
Opportunity publication date
03 April 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The combined sewage drainage network of the student village in Hürth-Efferen is lower than the public sewer system and requires a pumping station to discharge the combined sewage into the public sewer system.the existing pumping station was flooded during a heavy rainfall event and then only provisionally repaired.The following measures are planned for the existing structure:- Dismantling of the existing internal maintenance access between the drying room and pump sump- Dismantling of existing technical equipment- New maintenance access for the pump sump (access from outside)- Replacement of the pressure relief shaft with a larger, compliant channel- Replacement of the pipe penetrations

Opportunity closing date
08 May 2024
Value of contract
to be confirmed

About the buyer

Address
Kölner Studierendenwerk AöR Universitätsstr. 16 50937 GERMANY
Contact
isg-bau@kstw.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?