Germany - The combined sewage drainage network of the student village in Hürth-Efferen is lower than the public sewer system and requires a pumping station to discharge the combined sewage into the public sewer system....
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 08 May 2024
- Opportunity publication date
- 03 April 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The combined sewage drainage network of the student village in Hürth-Efferen is lower than the public sewer system and requires a pumping station to discharge the combined sewage into the public sewer system.the existing pumping station was flooded during a heavy rainfall event and then only provisionally repaired.The following measures are planned for the existing structure:- Dismantling of the existing internal maintenance access between the drying room and pump sump- Dismantling of existing technical equipment- New maintenance access for the pump sump (access from outside)- Replacement of the pressure relief shaft with a larger, compliant channel- Replacement of the pipe penetrations
- Opportunity closing date
- 08 May 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- Kölner Studierendenwerk AöR Universitätsstr. 16 50937 GERMANY
- Contact
- isg-bau@kstw.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.