Canada - T2024-119 - Mill Creek Road & Elgin Street Watermain

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 April 2024
Opportunity publication date
02 April 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

This project includes the construction of new 300mm transmission watermain and replacement of the existing local 150mm watermain on Mill Creek Road. Removal of the existing watermain and installation of a dual use watermain on Samuelson Street, and the installation of an interconnect watermain on Elgin Street between Linnwood Ave and Hilltop Drive. The watermains listed above are to be installed by a combination of open-cut methods, including usage of a trench box to limit the proximity to the 10” high pressure gas main, and horizontal directional drilling for the Franklin Boulevard and Mill Creek box culvert crossings. The works also include the installation of a combination air and vacuum release valve.

Opportunity closing date
23 April 2024
Value of contract
to be confirmed

About the buyer

Address
Region of Waterloo CANADA

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?