France - Swimming pool construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
25 February 2019
Opportunity publication date
08 January 2019
Category
45212212, , , , , , , , , , , , , , , , , , , , ,
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Foundations - structural work: 4,500 m rebuilt; 2,620 m of rehabilitation including the exterior development of mineral beaches. New glued laminated timber structure for the rebuilt part: 4,800 m - reinforcement of the skating rink structure: 1,300 m - supply and installation of all the bis cladding for the new and renovated facades: 7,400 m . Reinforcement of the steel structure of the bowling alley: 600 m - reinforcement of the metal post structures of the ice rink and swimming pool - construction of the wooden cladding structures of all the facades. Construction of all waterproof roofs (7,200 m) including existing removal and support steel tanks, lighting, access and smoke extraction skylights, all galvanized steelwork and rainwater drainage accessories as well as the individual and collective roof security system. Construction of the walls of the aluminium exterior facades of the reconstruction (4,800 m) and bowling alley (600 m), the walls of the interior facades - signage. Realization of all metal door blocks, railings, handrails, handrails, gates. Supply and installation of various fittings (reception desk in the hall, toilet plans for all the changing rooms, toilets and offices), wooden door units, shop windows, wooden skirting boards, benches, rearrangement of the bowling reception unit, wooden ceiling panel. Realization of suspended ceilings, acoustic correction elements and plaster partitions. Construction of the screeds, liquid waterproofing, tiles for all surfaces of the aquatic centre: 4,700 m . All paints (exterior, interior on various substrates) for the entire project: 7,400 m - supply and installation of all soft floors (rehabilitated part: 2,600 m). Supply and installation of all compact laminate furniture, including undressing booths, showers, lockers and storage furniture. Supply and installation of specific pool equipment: starting blocks, recessed ladders, stainless steel railings, non-return gates, pool equipment. Supply and installation of an external stainless steel pool cover with its thermal cover: 43 m rectangular. Manufacturing and installation of a sauna for 12 people with all the accessories - manufacturing of the Hamman door. Supply and installation of 2 elevators, one of which is a double door with a 4-storey service. The second one has a double entrance with 2 outdoor levels and a lifting platform (1.20 m). Manufacturing and installation of an indoor climbing wall 7.50 m high, 12 lanes with slopes of about 2 m over 1/3 of the surface, 37 holds per square meter. Manufacture and installation of a 70 ml polyester outdoor slide with a sound and light system. Supply and installation of an ozone water treatment system with pre-filtration, filtration, chlorine manufacturing station. Supply and installation of water and air games (indoor in a 220 m pool and outdoor 100 m of Splashpad). Supply and installation of the entire HVAC system - sanitary plumbing - heat production is maintained - absorption heat pump. Supply and installation of the entire electrical installation (high and low currents) from the private electrical transformer including access controls. Trenches for networks: 440 ml - EU pipes: 230 ml - EP pipes: 335 ml - EU manhole of 1000: 8 - HDPE pipes: 70 ml - 1000 EP manholes: 11 - TPC pipes: 530 ml.

Opportunity closing date
25 February 2019
Value of contract
to be confirmed

About the buyer

Address
Mairie de Gérardmer 46 rue Charles de Gaulle Gérardmer 88400 France
Contact
services.techniques@mairie-gerardmer.com

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?