Finland - Steam Piping
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 03 August 2018
- Opportunity publication date
- 21 June 2018
- Value of contract
- £0-100k
- Your guide to exporting
Description
Scope of work includes: — pipes and pipe parts (including for example bends, elbows, reducers, Y-pieces, T-pieces, condensate pockets) material, prefabrication and installation, — installation of piping related equipment, for example reduction station, valves and silencers, — primary and secondary supports (tertiary superstructure by building contractor), — scaffolding, — all needed documentation according PED 2014, EN12952 and EN13480.
The following detail design is included in the Suppliers's scope of work: — final stress analysis and strength calculations, the purchaser will deliver preliminary stress analysis, — non-standard pieces calculation and workshop drawings, for example live steam header, turbine transition piece, — the supplier will make detail design to the purchaser's PDMS 3D-model on the purchaser's preliminary design, — detail isometric drawings, — detail support drawings.
Note: piping supplier is the fabricator of the piping and shall give CE-marking of its scope of work according PED2014.
The design, all works, testing and inspections shall be done in boiler side according to standard EN12952 and turbine side (after main shut-off valve)according to EN13480.
The all needed design documents according to EN12952 shall be given for boiler manufacturer.
- Opportunity closing date
- 03 August 2018
- Value of contract
- £0-100k
About the buyer
- Address
- Pori Energia Oy Radanvarsi 2 Pori 28100 Finland
- Contact
- hannu.turunen@porienergia.fi
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.