Poland - Solar photovoltaic modules

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
16 May 2019
Opportunity publication date
11 April 2019
Category
9331200
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Delivery and installation of solar collectors and photovoltaic installations in the Tuszów Narodowy and Mielec Municipalities, including: 1.1. within the scope of solar collector installation: 1) delivery and installation based on the technical documentation of 285 sets of solar collector installation sets and a structure adapted to the installation site, including: a) in the Tuszów Narodowy Commune (203 sets in total):- 117 sets (including: 2 collectors and a 200 dm3 tank) mounted on residential buildings of natural persons, - 79 sets (including: 3 collectors and a 300 dm3 tank) mounted on residential buildings of natural persons, - 7 sets (including: 3 collectors and a 300 dm3 tank) mounted on residential buildings of natural persons: 4 collectors and a 400 dm3 tank installed on residential buildings of natural persons, b) in Mielec Commune (82 sets in total): - 26 sets (consisting of: 2 collectors and a 200 dm3 tank) installed on residential buildings of natural persons, - 52 sets (consisting of: 2 collectors and a 200 dm3 tank) installed on residential buildings of natural persons 4 sets (consisting of: 4 collectors and a 400 dm3 tank) mounted on the residential buildings of natural persons,2) disassembly of the existing heater c.3) installation of a new hot water heater with a mixing valve and installation of it in the hot water circuit,4) installation and insulation of pipelines between collectors, pump group and hot water heater,5) installation of pump group,6) installation of temperature sensors in solar collectors and tank,7) connection of existing heat source to hot water heater,8) rinsing with solar fluid and carrying out leakage tests of the solar installation,9) filling, venting and appropriate regulation of liquid flow and determining the correct pressure according to the solar collector manufacturer's instructions,10) finishing at least in accordance with the original state of the system passages (plaster / insulation, passage through walls, ceilings), 11) programming and activation of the automatic control system together with connecting the communication modem to the regulator and attaching it to the wall next to the pump group, 12) training the system user in operating the devices used. Each device should have attached Technical and Operating Documentation, operating manual and general installation diagram,13) other elements included in Annex 1aa to the ToR and Draft Agreement constituting Annex No. 2a to the ToR.1.2. within the scope of photovoltaic installations: 1) delivery and installation based on the technical documentation of 322 sets of photovoltaic installations together with the structure adjusted to the place of installation, includinga) in Tuszów Narodowy Commune (219 sets in total),b) in Mielec Commune (103 sets in total),2) installation of inverter,3) DC installation,4) AC installation,5) protection against electric shock, overvoltage,6) installation of earthing and compensating connections,7) tests, tests and start-ups of photovoltaic installation,8) training the users on the principles of correct operation of the photovoltaic installation together with the development of detailed operating instructions and their handing over to the users,9) preparation of application documentation to the electricity supplier,10) other elements included in Annex No. 1ab to the ToR and the Draft Agreement constituting Annex No. 2a to the ToR.2The detailed scope of works (Description of the subject of the Order) is included in Appendix 1aa to the ToR (Part 1 of the order - solar collectors) and Appendix 1ab to the ToR (Part 1 of the order - photovoltaic installations). 1) delivery and installation of biomass boilers in residential buildings in the Tuszów Narodowy and Mielec Municipalities, including: 1) delivery and installation based on the technical documentation of 91 biomass (pellet) boilers for heating buildings in residential buildings, including: a) in the Tuszów Narodowy Municipality (66 units in total): - 2 units with a minimum heating power of 1.5 MW, - 2 units with a minimum heating power of 1.5 MW, - 1) delivery and installation based on the technical documentation of 91 units of biomass (pellet) boilers for heating buildings in residential buildings, including: a) in the Tuszów Narodowy Municipality (66 units in total): - 2 units with a minimum heating power of 1 MW. 12 kW- 12 pcs. with min. heating power 15 kW,- 12 pcs. with min. heating power 17 kW,- 4 pcs. with min. heating power 18 kW,- 1 pcs. with min. heating power 19 kW,- 14 pcs. with min. heating power 20 kW,- 2 pcs. with min. heating power 21 kW,- 10 pcs. with min. heating power 22 kW,- 1 pcs. with min. heating power 23 kW,- 1 pcs. with min. heating power 24 kW,- 5 pcs. with min. heating power 25 kW,- 1 pcs. with min. heating power 28 kW,- 1 pcs. with min. heating power 29 kW,b) in Mielec Municipality (total of 25 units): - 1 unit with a heating power of min. 12 kW- 1 pcs. with min. heating power 13 kW- 2 pcs. with min. heating power 15 kW,- 6 pcs. with min. heating power 17 kW,- 2 pcs. with min. heating power 18 kW,- 11 pcs. with min. heating power 20 kW,- 1 pcs. with min. heating power 22 kW,- 1 pcs. with min. heating power 25 kW,2) installation of flue pipe to the chimney,3) installation of system security,4) installation of boiler connection to the central heating system,5) installation of boiler connection to the installation c. w. u,6) installation of circulation pumps,7) installation of control and regulation system,8) tests, tests and start-ups of biomass boiler plant installation,9) restoration to the original state of all damaged surfaces, structural elements and other elements damaged or damaged or damaged as a result of installation installation,10) training of users on the principles of correct operation of the installed biomass boiler together with detailed operating instructions and their handing over to users,11) other elements included in Annex No. 1b to the ToR and the Draft Contract constituting Annex No. 2b to the ToR.10) training of users on the principles of correct operation of the installed biomass boiler together with the development of detailed operating instructions and their handing over to users,11) other elements included in Annex No. 1b to the ToR and the Draft Contract constituting Annex No. 2b to the ToR.10.The detailed scope of works (Description of the subject of the Order) is included in Appendix No. 1b to the ToR (part 2 of the order - biomass boilers). 1) delivery and installation of heat pumps in residential buildings located in the Tuszów Narodowy and Mielec Municipalities, including: 1) delivery and installation based on the technical documentation of 151 heat pumps used to prepare HUW and HUW and central heating, including: a) in the Tuszów Narodowy Municipality (total of 102 units):- 21 heat pumps for HUW of min. 2 kW installed in residential buildings of natural persons,- 77 heat pumps for DHW with min. 3kWW installed in residential buildings of natural persons, - 1 pc. of heat pumps for domestic hot water of min. 3kW installed in a private household building, - 3 heat pumps for DHW and central heating of min. 10 kW installed in residential buildings of natural persons,b) in Mielec Municipality (total of 49 units):- 2 units of heat pumps for DHW with a power of min. 3 kW,- 40 pcs. of heat pumps for DHW with min. 4 kW,- 5 pcs. of heat pumps for DHW and central heating of min. 12kW,- 2 heat pumps for DHW and central heating of min. 16 kW,2) installation of air ducts,3) connection of hot water heater (heat pumps) to the existing domestic hot water system, hot water circulation and hot water circulation system,4) installation of fittings, devices and other components according to the technological scheme,5) installation of the control system,6) flushing and pressure tests of the installation,7) filling the installation,8) start-up of the installation,9) training of users in the correct operation of heat pumps for domestic hot water and hot water. o. together with the development of detailed operating instructions and their handing over to the users,10) supplementing and sealing losses after cable crossings, making cold, hot water and electric water installation wires necessary to connect with the designed system.11The detailed scope of works (Description of the subject matter of the Order) is included in Appendix No. 1ca to the ToR (Part 3 of the Order - heat pumps to HUW) and Appendix No. 1cb to the ToR (Part 3 of the Order - heat pumps to HUW and CH).

Opportunity closing date
16 May 2019
Value of contract
to be confirmed

About the buyer

Address
Gmina Tuszów Narodowy Tuszów Narodowy 225 Tuszów Narodowy 39-332 Poland
Contact
gmina@tuszownarodowy.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?