Poland - Solar photoelectric modules

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 July 2022
Opportunity publication date
03 June 2022
Category
9331200: Sol
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject matter of the contract is supply and installation of photovoltaic and heat pump systems in the following communes: Nowy Targ, Miasta Nowy Targ, Czorsztyn, Łapsze Niżne, Brzesko, Alwernia, Babice, Chrzanów, Libiąż and Trzebinia, which is realized under the project "Installation of renewable energy sources in the following communes: Nowy Targ, Miasta Nowy Targ, Czorsztyn, Łapsze Niżne, Brzesko, Alwernia, Babice, Chrzanów, Libiąż and Trzebinia".
Supply and installation of photovoltaic systems in the Municipalities of: Nowy Targ, Miasta Nowy Targ, Czorsztyn, Łapsze Niżne, Alwernia, Babice, Chrzanów, Libiąż and Trzebinia, including: 1) supply and installation, based on the technical documentation held by the Employer, of 170 sets of photovoltaic installations, on residential and public buildings, together with a structure adapted to the place of installation, 2) execution in each location, no later than 60 days after signing the agreement with the Employer, 2) preparation of an inventory of buildings in each location, no later than 60 days after signing the contract with the Employer, from which Protocols of Arrangement of Installation will be drawn up with a projection of the roof with the location of photovoltaic modules in a graphics program with the possibility of scaling and/or with a projection of the land with the location of installation on the ground and the route of DC and AC cables.33) supply and installation of a structure for PV modules,4) supply and installation of brand new PV modules not older than 2021,5) supply and installation of brand new inverters/ DC/AC inverters not older than 2021,6) excavation of trenches in the ground to the required depth if the photovoltaic panels will be located outside the building, where the main switchgear will be located at a distance of up to 25 meters in a straight line, above 25 meters excavation is performed by the resident,7) laying cable routes, grounding and cables from the PV panels to the inverter and cables from the inverter to the electrical switchgear8) installation of switchgear for photovoltaic (DC and AC side) along with grounding the installation (the value of resistance to grounding should reach <10 Ohm),9) equipping the DC switchgear (surge protector, DC fuse disconnector)10) equipping the AC switchgear (fuse disconnector, surge protector, overcurrent circuit breaker)11) performing tests of the installation and checking the proper operation of the equipment,12) start-up of the system and adjustments,13) measurements of electrical installations required by applicable regulations,14) configuration of all inverters, connection to the user's Internet network (if there is no permanent Internet connection in the place where the inverter is located, the costs of connection are covered by the user; if there is no Internet network at all, it is required that the user is equipped with a module allowing for future connection to the Internet.The system will have to be equipped with a module that will allow the User to connect to the Internet in the future. The system must be available for stationary and mobile devices on iOS and Android platforms, the devices monitoring the operation of the system should be able to communicate with a dedicated server, where the intended data will be saved,15) training of facility managers and users in the handling and use of photovoltaic installations made in the scope of this procedure,16) preparation of documentation for the notification of micro-installation connection to the power grid of the regional OSD,17) making the necessary holes and assembly passages for the introduction of devices,18) sealing the holes and assembly passages after the introduction.2Detailed scope of work (Description of the subject matter of the contract) is included in attachment no. 1.1 to the SWZ - Technical documentation of photovoltaic installations (part 1 of the contract). Supply and installation of heat pumps in the following communes: Nowy Targ, City of Nowy Targ, Czorsztyn, Łapsze Niżne, Babice, Chrzanów, Libiąż, covering 1) supply and installation, based on the technical documentation possessed by the Employer, of 142 units of heat pumps in residential and public utility buildings, together with accessories,2) installation of air ducts,3) connection of the hot water heater 3) connecting a hot water heater (heat pump) to the existing hot water, hot water circulation and water supply systems,44) installation of fittings, devices and other elements according to a process diagram,5) installation of a control system,6) flushing and pressure testing of the system,7) filling the system,8) start-up of the system,9) training of the users on the principles of the proper operation of the installed heat pumps, including the development of detailed operating manuals and handing them over to the users,10) filling and sealing of pipe penetrations, construction of cold water, hot water, central heating and electrical system pipes necessary for the connection to the designed system.2Detailed scope of work (Description of the subject of the contract) is included in appendix no. 1.2 to the SWZ - Technical documentation of the heat pump installation (part 2 of the contract).

Opportunity closing date
06 July 2022
Value of contract
to be confirmed

About the buyer

Address
Gmina Nowy Targ ul. Bulwarowa 9 Nowy Targ 34-400 Poland
Contact
przetargi@ugnowytarg.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?