Germany - Site equipment

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
19 August 2021
Opportunity publication date
24 July 2021
Category
45113000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

As part of the modernisation of the school centre in Coesfeld, site equipment and the associated site logistics are to be provided for the entire construction period (early measures, 1st construction phase to 3rd construction phase). The provision time of the individual elements is described in more detail in the specifications.
1. Construction phase - superordinate construction site logistics- familiarization 1,000 lump sum,- planning at project start 1,000 lump sum,- planning project-accompanying 3,000 days,- project management construction logistics 14 Mt,- operative construction logistics expert 14 Mt,- access control 1,000 pieces,- remote turnstile 3,000 pieces,- Software access control 1,000 lump sum,- Coloured badges access control 200,000 pieces,- On-line visualization system 1,000 lump sum,- Mobile construction fence 378,000 meters,- Mobile construction fence gate 1-wing 1,000 pieces,- Mobile construction fence gate 2-wing 1,000 pieces,- Visual protection tarpaulin 131,500 meters,- Panic door 3,000 pieces,- Barrier remote with under creep protection 1,000 pieces,- Traffic guidance sign 4,000 pieces,- Traffic sign 9,000 pieces,- Double sided guide beacon 13,000 pieces,- Barrier barrier 60,000 meters,- Yellow marking pedestrian crossing 1,000 pieces,- speed bump 2,000 pieces,- escape route signage staircases, corridors 20,000 pieces,- escape and traffic route cleaning 1,000 m2,- sweeper vehicle, arrival and departure 21,000 pieces,- disposal of sweeping material 0.5 tons,- winter service 30,000 pieces,- disposal of gritting material 1.5 tons,- storage area made of gravel base course 3 200 m2,- building protection wall with wooden cladding 10,000 meters,- camera tower 1,000 pieces,- connection AG-side wash-shower-toilet container 2,000 pieces,- office container system AG 1,000 pieces,- connection transformer cabinet 1,000 pieces,- rubber hose line H07RN-F 4 x 2402 10,000 meters,- Building power distribution board 1,000 pieces,- Rubberized flexible cable H07RN-F 4 x 1202 75,000 meters,- Cable bridge 1,000 pieces,- Building power distribution board V 63, access control 1,000 pieces,- Rubberized flexible cable H07RN-F 4 x 162 25,000 meters,- Main distribution board 400 V/400 A 3,000 pieces,- Rubber-sheathed cable H07RN-F 4 x 1502 100,000 metres,- Rubber-sheathed cable H07RN-F 4 x 1202 100,000 metres,- Rubber-sheathed cable H07RN-F 4 x 702 50,000 metres,- Site power distributor V 63, barrier system 1,000 pieces,- Rubber-sheathed cable H07RN-F 4 x 162 75,000 metres,- Site power distributor VC 160, crane 1,000 pieces,- Rubber hose line H07RN-F 4 x 702 10,000 meters,,- Lighting container system 2,000 pieces,- Construction water connections produce 3,000 pieces,- Construction water line produce 140,000 meters,- Frost protection trace heating produce 140,000 meters,- Tapping point above ground produce 3,000 pieces.1. Construction phase - refectory - mobile construction fence 98,000 metres - mobile construction fence gate 2-winged 1,000 pieces - visual protection tarpaulin 98,000 metres - traffic signs 1,000 pieces - double-sided guide beacon 2,000 pieces - barrier 40,000 metres - chemical toilet 1,000 pieces,- Floor distributor V100, refectory, ground floor 1,000 pieces,- Rubber hose line H07RN-F 4 x 352 50,000 meters,- Floor distributor V63, refectory, upper floor 1,000 pieces,- Rubber hose line H07RN-F 5 x 102 25,000 meters,- Damp-proof diffuser lights IP54 6,000 pieces.1. Construction phase - school building- Mobile construction fence 168,000 meters,- Mobile construction fence gate 2-leaf 1,000 pieces,,- Visual protection tarpaulin 101,500 meters,- Chemical toilet 1,000 pieces,- Floor distributor V100, school building, ground floor 1,000 pieces,- Rubber hose line H07RN-F 4 x 352 100,000 meters,- Floor distributor V63, school building, upper floor 1,000 pieces,- Rubber hose line H07RN-F 5 x 102 50,000 meters,- Damp-proof diffuser lights IP54 6,000 pieces.2./3. Project management construction logistics 37,000 Mt,- Operative construction logistician 37,000 Mt,- Coloured badges for access control 300,000 pieces,- Mobile construction fence 140,000 metres,- Mobile construction fence gate 1-wing 2,000 pieces,- Visual protection tarpaulin 133,000 metres,- Panic door 1,000 pieces,- Escape route signposting staircases, escape route signs staircases, corridors 100,000 pieces,- escape and traffic route cleaning 2500 m2,- arrival and departure of sweeper 37,000 pieces,- disposal of sweepings 1,500 tons,- winter service 72,000 pieces,- disposal of grit 3,500 tons,- building protection wall wood cladding 45,000 meters,- protective scaffolding 1,000 pieces,- first aid container 1,000 pieces,- wash-shower-toilet container 3,000 pieces,- staircase 2,000 pieces,- construction power distributor V 160, BT 3 and 4 1,000 pieces,- rubber hose line H07RN-F 4 x 502 25,000 meters,- floor distributor V63, BT 3 and 4 3,000 pieces,- Rubber hose line H07RN-F 5 x 102 30,000 meters,- Building power distributor V 160, BT 3 and 4 1,000 pieces,- Rubber hose line H07RN-F 4 x 502 50,000 meters,- Floor distributor V63, BT 3 and 4 3,000 pieces,- Rubber hose line H07RN-F 5 x 102 30,000 meters,- Building power distributor V 400, BT 1 and 2 1,000 pieces,- Rubber hose line H07RN-F 4 x 702 100,000 meters,- Building power distributor V 160, BT 1 and 2 1,000 pieces,- Rubber hose line H07RN-F 4 x 502 75,000 meters,- Floor distributor V100, BT 7 1,000 pieces,- Rubber hose line H07RN-F 4 x 352 100,000 meters,- Damp room diffuser lights IP54 25,000 pieces.

Opportunity closing date
19 August 2021
Value of contract
to be confirmed

About the buyer

Address
Stadt Coesfeld – die Bürgermeisterin – Fachbereich Bauen und Umwelt – Zentrales Gebäudemanagement Markt 8 Coesfeld 48653 Germany