Germany - shell works
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 04 April 2019
- Opportunity publication date
- 05 March 2019
- Category
- 45223220
- Value of contract
- to be confirmed
- Your guide to exporting
Description
- 1 665 m2 Capillary breaking layer gravel/ RC16/32 D 14 cm,- 1 800 m2 in-situ concrete Cleanliness layer unreinforced C8/10 F3 D 10-15 cm,- 1 650 m2 in-situ concrete Floor reinforced concrete C30/37 XC1-XC3 F3 D 30-75 cm, incl. formwork and reinforcement,- 2 000 m2 in-situ concrete Exterior walls reinforced concrete C30/37 XC1-XC3 F3 D 25-30 cm, incl. formwork and reinforcement,- 8 pcs. Cellar light shaft precast concrete element B 150 cm 200 cm T 80cm incl. grating cover and drainage,- 2 700 m2 in-situ concrete interior walls reinforced concrete C30/37 XC1 F3 D 20-30 cm, incl. formwork and reinforcement,- 3 380 m2 in-situ concrete slab pl. reinforced concrete C30/37 XC1-XC3 F3 slab D 30-60 cm, incl. formwork and reinforcement,- 370 pcs. Recesses in external walls and ceilings for doors, windows and installation cables 0.5-13.5 m2 D 20-30 cm, incl. formwork,- 14 pcs. flight of stairs straight prefabricated run-B 130 cm gradients 11-14 pcs. gradient of stairs 17 cm step 28 cm C35/45 XC1,- 70 m in-situ concrete coating reinforced concrete C30/37 or C35/45 XC1 F3 B 25-80 cm H 75-130 cm, incl. formwork and reinforcement,- 15 m edging angle support element reinforced concrete 215/430 cm,- 350 m3 mineral mixture for floor filling,- 230 m2 masonry inner wall D 11,5-24 cm KS SFK20 RDK1,8 MGIIa 3DF, F 90, incl. door openings during bricklaying and KS lintels,- 275 m laying of drainage pipes made of PVC (U)-rod drainage pipes DN 100-200, incl. Earthworks and connection material,- 1 765 m2 waterproofing of floor slabs W1.2-E single-layer polymer bitumen welding membrane PYE-PV200S5 BA, incl. substrate cleaning and priming bitumen emulsion,- 1 665 m2 perimeter insulation PS rigid foam XPS 0.035W/(mK) D 120-240 mm PB 355kN/m2 incl. Building protection membranes as protective layer D 15 mm and sliding layer PE foil D 0.3 mm 2-layer Cleanliness layer concrete,- 1 375 m2 Waterproofing walls W1.2-E 2-layer Polymer bitumen welding membrane PYE-PV200S5 BA, incl. Cold bitumen primer,- 850 m2 Vertical drainage layer burled membrane D 4-9 mm,- 940 m2 Perimeter insulation PS rigid foam XPS 0,040W/(mK) D 120-240 mm PW dx 150 kN/m2,- 1 pc. Lifting unit 1205/2,- 1 pc. Lifting unit 1508,- 100 m waste water HT-PP DN110 Trench installed Bedding type 1 Bedding-D 10 cm incl. earthworks and connecting material,- 420 m Elt cable route outside area in protective pipe DN90 incl. 3 concrete shaft 140 x 70 x 120 cm (LxWxD) and required earthworks,- 3 220 m FFKuS-ES-F-UV 20-63 Highspeed 43412 installed in concrete,- 1 200 pcs. Device connection box EH 74 mm, diameter 60 mm, in-situ concrete, - 430 pcs. Connection box EH 61/75/79 mm, in-situ concrete.
- Opportunity closing date
- 04 April 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- Land Berlin (SILB Sondervermögen Immobilien des Landes Berlin), vertreten durch die BIM Berliner Immobilienmanagement GmbH Keibelstraße 36 Berlin 10178 Germany
- Contact
- einkauf@bim-berlin.de
The deadline to apply for this opportunity has passed.