Germany - Services of engineering offices

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
10 May 2019
Opportunity publication date
11 April 2019
Category
71300000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The object of procurement is the awarding of the necessary basic services for work phases 1-8 in accordance with Part 4, Section 2, Section 55 HOAI (technical equipment) for the modernisation of the ventilation system in building 2 of the Integrated Comprehensive School Ernst Bloch (IGSLO), Hermann-Hesse-Str.9-11, 67071 LU. According to the cost assumption, the manufacturing costs for cost groups 410 to 440 and 480 in accordance with DIN276-1:2008-12 for the project amount to approx. EUR 1,554,000 excl. VAT. The cost group (KG) 410 (according to DIN 276) accounts for approximately EUR 30 000, the KG 420 for approximately EUR 405 000, the KG 430 for approximately EUR 663 000, the KG 440 for approximately EUR 50 000 and the KG 480 for approximately EUR 406 000, of which (IGSLO), Hermann-Hesse-Str. 9-11, 67071 Lu.-Oggersheim, was put into operation in 1980. The comprehensive school consists of House 1 (UG, ground floor, 1st floor) and House 2 (UG, ground floor, 1st and 2nd floor), a separate sports hall and a separate building with indoor swimming pool. IGSLO House 2 is supplied with ventilation by three ventilation centres in the basement. The supply air reaches the ventilation units via air intake shafts. The object of the procurement is the awarding of the required basic services of work phases 1 to 8 according to Part 4, Sectoral Planning, Section 2, § 55 HOAI (Leistungsbild Technische Ausrüstung) for the modernisation of the ventilation system in Building 2 of IGSLO. According to a demand planning of the client, the modernization of the ventilation system in house 2 should be realized. For this purpose, all ventilation units including all duct installations and component parts, the heating and heat recovery systems as well as the refrigeration systems within the ventilation centres are to be dismantled. The air intake structures must be upgraded. The central units in the ventilation centres including the ventilation ducts with accessories, the exhaust fans, the heating distributors with connection to the ventilation units and the entire building automation must be replaced. The new supply and exhaust air systems shall be equipped with a heat recovery system. The scope of the overall measure to be planned comprises the following plant groups:Plant group 1: Waste water, water and gas plantsComprising waste water plants:-- Disassembly and disposal,-- Adaptation and installation of the new waste water disposal plants of the respective plant components,- Water plants:-- Disassembly and disposal,-- Adaptation and installation of the water supply plants of the respective plant components.System group 2: Heat supply systemsComprising heat distribution networks:-- Dismantling and disposal,-- Adaptation and installation of the heat distribution network (heating group, piping, integrated circuit system, etc.).System group 3: Ventilation systemsComprising ventilation systems:-- Dismantling and disposal,-- Upgrading of the air intake structures,-- Renewal of the central devices in the ventilation control centres, including the central heating systems,-- Installation of the ventilation systems in the ventilation control centres, including the central air intake systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation systems,-- Installation of the ventilation system,including the ventilation. of the ventilation ducts with accessories, the exhaust air fans, the heating distributor with connection to the ventilation units,-- equipping the new supply and exhaust air systems with a heat recovery system,-- installation of a new refrigeration system for the ventilation units.system group 4: high voltage systemsconsisting of- low voltage installation systems:-- dismantling and disposal,-- renewal of the wiring of the field devices (sensors, fire dampers, adjusting motors etc.)Plant group 8: Building automationComprising automation systems:-- Dismantling and disposal,-- Installation of a new DDC system for the control of the HLS systems in building 2. This system must be installed at the higher-level control centre of the local energy supply company (system will be installed in the contracting company).For further detailed information, please refer to the participation documents.

Opportunity closing date
10 May 2019
Value of contract
to be confirmed

About the buyer

Address
Stadt Ludwigshafen, Bereich Gebäudemanagement Rathausplatz 20 Ludwigshafen 67059 Germany
Contact
joachim.kazik@ludwigshafen.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?