Germany - Services of architectural offices

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 August 2020
Opportunity publication date
09 July 2020
Category
71200000: Ar
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Realschule Hechingen was built in the 1970s. Due to its age, the façade is now in a damaged condition and needs to be renewed. Ceilings and parapet areas are made of reinforced concrete, the facade consists of wood-glass elements. The type and design of the new facades must be determined in the course of planning. After renovation, the façade must meet or exceed current energy standards. The desired energy standard is to be determined in the course of the planning process, and integrated systems for energy generation and storage (heat and cold) are to be considered and evaluated during the preliminary planning and selection of variants. The new facades must ensure that the rooms, especially the classrooms during lessons, can be supplied with sufficient fresh air. Within the framework of the preliminary planning, consideration must be given to the possibilities of natural or forced ventilation. A central ventilation system has been removed and is no longer in place; the radiators are located along the façade windows. These will probably also have to be replaced and modernised or re-dimensioned in the course of the project. In the course of the preliminary planning, suitable systems are to be considered and coordinated with the specialist planner on site. The existing building components in the existing building are contaminated with pollutants, in particular polychlorinated biphenyls (PCB) have been proven. The pollutants (primary and secondary sources) must be professionally removed in the course of the renovation. In addition, the teachers' room on the ground floor is to be extended as part of the measures. (Extension) Preliminary investigations In 2014, the Hähnig und Gemmeke office, Tübingen, developed a rough concept with a rough cost estimate with the aim of showing the municipal council and the administration the financial resources required to renovate the school. The results are attached as annexes. All planning services are transferred to the contractor. TGA on site.costs In the first rough cost estimate, costs of EUR 2 800 000 gross are assumed for the facade renovation and extension of the teachers' room (cost index 2020).dates The measures are to be carried out in several construction phases during the summer months. The focus of the work will be on the respective holiday periods. It is imperative that school operations are maintained, provisional arrangements are to be minimized to the absolute minimum, and the first construction phase is to begin in 2021. Completion is planned by 2023, and planning must begin immediately after the contract is awarded. - LPH 1-3 design and cost calculation until Dec 2020 (construction decision);- LPH 4-7 tender BA1 until March 2021;- LPH 8 start of construction BA1 until Jul 2021 completion 2023.
Building planning according to § 33 HOAI work phases 1-9 The commissioning of the work phases is carried out in stages. The client is free in his decision about a further assignment; there is no right to transfer further services. It is intended to apply for the work phases in stages. The client is free in his decision about a further assignment; there is no right to transfer further services.

Opportunity closing date
06 August 2020
Value of contract
to be confirmed

About the buyer

Address
Stadt Hechingen Marktplatz 1 Hechingen 72379 Germany
Contact
degelmann@klotzundpartner.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?