United States - S--2019 Clear Vegetation at Various Locations

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
24 May 2019
Opportunity publication date
25 April 2019
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Added: Apr 24, 2019 9:37 am

SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision

required to accomplish the following:

GENERAL DESCRIPTION: Contractor shall clear and remove all undergrowth and overhanging

trees, brush/limbs, and vegetation to provide clear line of sight so future maintenance can be

accomplished with afinished mower.

1. Paradise Pt Service Roads (General area of Seth Williams Blvd - See 5 Maps)

(approximately 7.5 miles)

2. Bldg 575 Security Fence (approximately 1,691 LF)

3. Bldg A66 and A11 Security Fence (approximately 2,145 LF)

GENERAL REQUIREMENTS:

1. Vertical cut any brush and limbs that extends into the areas to be cleared up to a height of 10-

12 feet.

All trails shall be cleared of vegetation not to exceed 8 feet from center of asphalt to hard

tree line on BOTH side of trail edge, boardwalks and drainage ditch (total 16 feet clearance) to

the hard tree lines. Trees and brush shall be cut between 2” – 6” in height.

2. Hand trim vegetation around bridges, fences, poles and any permanent structures located

within the cleared areas.

3. For this Scope of Work, hard tree line is defined as trees with a diameter greater than 3 inches.

All hard trees lines shall be left in place.

4. All live or dead trees, logs, limbs or branches resting on the ground at the shoulder or in the

drainage ditch shall be placed at least 10 feet into the tree line.

Vegetation that is mulched may

discard into surrounding wood line at a minimum of 10 feet, ensuring not to leave in piles or

discard into drainage ditches. Any vegetation removed from the site shall be removed in

accordance with Special Instructions.

5. Before beginning clearing or cleaning operations, the contractor shall block off with a physical

barrier, such as extended saw horses or caution tape, at all entry points to the work area to keep

personnel from being exposed to the clearing and cleaning operations. Signs shall be posted at

the barriers warning personnel that the area is closed for maintenance. While working on gravel

areas, the contractor shall provide personnel to direct traffic around the work area.

The

contractor shall provide traffic control (i.e. cones, flagman, signs, etc.) sufficient to prevent

injury to personnel, damage to property, and allow for safe flow of traffic. Notify the Base

Provost Marshall’s Office (PMO), 451-3004/3005, prior to detouring or re-routing traffic.

6. All grounds disturbed by the contractor shall be repaired by filling with clean topsoil, raking,

reseeding, grading, and compacting. Seed with Coastal Lawn Mix applied at a rate of 50

pounds/acre. Disturbed areas include but are not limited to ruts, holes, gouges, scrapes, scratches

and tire tracks.

7. Contractor shall remove all trash that is laying within areas where work is being performed on

a daily basis.

The contractor shall clear all dirt, pine straw, and debris over the length of the

entire trail and all debris that will interfere with future mowing operations. No equipment or

material shall be stored on the work site without specific permission from the project manager or

the performance assessment representative (PAR). The contractor shall ensure that all areas and

systems contiguous to the work site remain undisturbed, or are returned to its original condition

and operation as soon as practical.

SPECIFICATIONS FOR PARADISE PT (AMCC):

WO#4879293

1. Contractor shall clear along the Service Roads, Jogging Trails and along Seth Williams Blvd.

a. SERVICE ROADS – WOOD LINE side only

b.

JOGGING TRAILS ALONG SETH WILLIAMS BLVD – BOTH SIDES

2. Call POC(s): Mr. Jared Sabo (910) 219-6363 or email: Jared.Sabo@atlanticmcc.com letting

him know work start date and schedule.

SPECIFICATIONS FOR BLDG 575 SECURITY FENCE:

WO#4849722-Child tkt

1. PHYSCIAL SECURITY REQUIREMENTS (MCO P5530.14): Fence must be kept clear of

visual obstruction such as vines, shrubs, trees, etc. Vegetation will not exceed 6 inches in height,

Interior clear zone shall not be less than 30 feet trees and/or limbs located outside of and within

15 feet and at least 20 feet outside of perimeter barriers.

2. Call POC(s): Sergeant Kevin Simek 450-5836 letting them know work start date and schedule.

SPECIFICATIONS FOR BLDG A66 and A11 SECURITY FENCE:

WO#4876561 (A66) and WO# 4876563 (A11)-Child tkt

1.

PHYSCIAL SECURITY REQUIREMENTS (MCO P5530.14): Fence must be kept clear of

visual obstruction such as vines, shrubs, trees, etc. Vegetation will not exceed 6 inches in height,

Interior clear zone shall not be less than 30 feet trees and/or limbs located outside of and within

15 feet and at least 20 feet outside of perimeter barriers.

2. Call POC(s): Terry Alexander 440-7759 email: terry.alexander.ctr@socom.mil letting them

know work start date and schedule.

SPECIAL INSTRUCTIONS: Vegetation that cannot be mulched shall be weighed at the Base

Sanitary Landfill located on Piney Green Road and delivered to the Recycling Center on Piney.

Green Road (across from the Landfill). Hours of operation: 0730 AM-1530 PM, Monday

through Friday, except holidays.

Opportunity closing date
24 May 2019
Value of contract
to be confirmed

About the buyer

Address
Department of the Navy NAVFAC Mid-Atlantic, ROICC Camp Lejeune United States

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?