Germany - Repair and maintenance of electrical and mechanical equipment in buildings

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 November 2020
Opportunity publication date
09 October 2020
Category
50710000
Value of contract
£0-100k
Your guide to exporting
Report opportunity

Description

- Maintenance, inspection, minor maintenance services on various air conditioning and refrigeration systems and associated services such as hygiene tests in accordance with VDI 6022, DGUV 4 and density tests, tests in accordance with the Industrial Safety Regulation, testing of leakage detection systems, expert tests, etc., energy inspections and conversion of refrigerants;- Establishment of a fault (emergency) service to maintain reaction times;- Elimination of faults that occur outside of maintenance, within the usual working hours, in case of danger also outside of these.
- Maintenance, inspection and minor maintenance services as well as associated tests, depending on the type of unit, for a total of 3 split air-conditioning systems, manufacturers: Mitsubishi, Midea, Panasonic 4 cold storage cells, manufacturers: 2x Viessmann, Celltherm, Lùnite HermetiqueRoller;- Tests: for leaks and hygiene (VDI6022) and in accordance with the Ordinance on Industrial Safety and Health, DGUV 4 test, energy inspection;- if necessary Testing of the leakage detection system;- Changeover to another coolant;- Creation of test books;- Establishment of a fault (emergency service) to ensure that reaction times are adhered to. - Maintenance, inspection and small maintenance services as well as associated services, depending on the type of unit, for a total of:-- 7 split air-conditioning systems manufacturers: 2xMitsubishi, Sanyo, York, Panasonic, Daikin, Fujitsu;-- 2 refrigeration systems (CO2 equivalent 471 tons), manufacturers: Energiegeräte GmbH;-- 4 cold storage cells, manufacturer: 2xViessmann, Zanotti, Silenys;-- 2 cold storage cells, manufacturer: Dresdner Kühlanlagenbau, condenser: Tecumseh Lunite Hermetique, evaporator: GEA KÜBA Kältetechnik;-- 1 compact air conditioning unit (supply air 19 000 m3/h, exhaust air 14 200 m3/h, manufacturer: Minerga);-- 4 air handling units.- 1x supply and exhaust air, 6 500 m3/h each; manufacturer: Wolf Geisenfeld;- 1x supply and exhaust air, make Helios;- Tests: for leak tightness and hygiene (VDI6022) and according to the Industrial Safety Regulation, DGUV 4 test;- Energy inspection;- Expert inspection of HVAC systems;- Inspection of the possibility of integrating the heat recovery device into the HVAC system;- Sound power measurements;- Air filter change;- HVAC according to VDI 6022;- Changeover to a different coolant;- Preparation of inspection books;- Cleaning of the aerosol separators;- Inspection of activated carbon filter;- HVAC, if necessary Change;- Establishment of a fault (emergency service) to maintain reaction times. - Maintenance, inspection and minor servicing and associated services, depending on the type of unit, for a total of:- 7 split air-conditioning systems, manufacturers: Fujitsu, toshiba, Sanyo, Günther; Daikin, thermotec, AUX- 1 cooling unit for cold stores, manufacturer: Lunitè Tecumseh Hermiteque;- 1 cold cell with cooling unit, manufacturer: Viessmann;- 9 wild cold cells, manufacturer: Viessmann;- a cooling compound (walk-in), manufacturer: Viessmann, with 5 cold rooms and 5 cooling surfaces (Ascoblock and Blanco) and 2 drive-through refrigerators (Juno);- 2 cold rooms with walk-in cold cell (deep-freeze and normal cooling), manufacturer: Viessmann;- 3 walk-in cold rooms (deep-freeze, pre-cooling and normal cooling), manufacturer: Viessmann;- 2 cooling surfaces, manufacturer unknown;- 1 AHU ZuL/AbL; 11.700 m3/h, manufacturer: Wolf Heizung, Lüftung, Klimatechnik;- 1 AHU ZuL; 18,090 m3/h, manufacturer: Wolf Mainburg;- 1 AHU AbL with 8 exhaust air fans;- 1 AHU ZuL/AbL (shooting range), 72,000/74.000 m3/h, manufacturer: Klimatec; 44 fire dampers, 1 exhaust air tower (central ventilation) - maintenance 2x per year;- 1 air handling unit for supply and exhaust air, 18036 m3/h, manufacturer: Wolf Geisenfeld;- a further 10 air handling units, including 2 supply and exhaust air units and 8 supply or exhaust air units with an air flow rate of 700 m3/h to 4 700 m3/h;- 13 decentralised units - supply or exhaust air - with various ventilation systems;- 1 air handling unit for supply and exhaust air, 18036 m3/h, manufacturer: Wolf Geisenfeld;- 1 air handling unit for supply and exhaust air, 18036 m3/h, manufacturer: Wolf Mainburg 2 HVAC systems -supply air and smoke extraction- with fire gas roof fans, including one system with smoke extraction unit, one HVAC system as supply air system (10,000 m3/h) and 18 smoke extraction dampers and one HVAC system with a further HVAC system for supply air (10,000 m3/h);- 1 AHU with roof fans and 2 further AHUs;- 22 radial roof fan systems for exhaust air;- 7 radial pipe fan systems;- 2 air handling units, each with an axial high-performance fan and a fire gas fan;- 6 -exhaust-duct fan systems and;- various accessories (12 ventilation control units, 28 duct smoke detectors and 19 fire protection disc valves);- 40 fire dampers;- a central exhaust air unit, 2 compact air handling units -one supply air and one exhaust air, 20 fire protection shut-off devices, 1 supply air and exhaust air system with duct fans;- tests: for leak tightness and hygiene (VDI6022) and according to the operational safety ordinance, DGUV 4 test;- Energy inspection;- Expert inspection of HVAC systems;- Inspection of the possibility of integrating the heat recovery device into the HVAC system;- Sound power measurements;- Air filter change;- HVAC according to VDI 6022;- Changeover to another coolant;- Preparation of inspection books;- Cleaning of the aerosol separators;- Inspection of the activated carbon filter;- HVAC, if necessary Change;- Establishment of a fault (emergency service) to maintain reaction times. - Maintenance, inspection and minor servicing and associated services, depending on the type of unit, for a total of:- 14 mono- and 2 multisplit systems, manufacturers: Mitsubishi, Daikin, Fujitsu, Panasonic, Sanyo, toshiba;- a refrigeration system for cold rooms as a compound system, manufacturer: Lunite Hermetique;- 3 refrigeration systems for 2 refrigeration points and 2 refrigeration systems for 1 refrigeration point each;- 3 air handling systems;- 3x supply/return air systems, manufacturer: Swegon, including one system for rotary recovery, one heat recovery station (WRG), one adsorption air dryer, 12 fire protection flaps;- tests: for hygiene (VDI6022 - initial and repeat inspection);- tests: for the safety of the refrigeration cells as a combined system, manufacturer: Mitsubishi, Daikin, Fujitsu, Panasonic, Sanyo, toshiba), in accordance with the Operational Safety Ordinance and, if necessary, for leak tightness, DGUV 4 test;- Energy inspection;- test of the leakage detection system;- expert test of HVAC systems;- additional air filter change;- HVAC in accordance with VDI 6022;- changeover to a different coolant;- test of the activated carbon filter;- HVAC, if necessary change;- establishment of a fault (emergency service) to maintain reaction times. The provision of services in this lot is subject to a declaration of readiness for a reliability check of the personnel intended to carry out the maintenance services in accordance with § 7 of the German Aviation Security Act (LuftSiG).

Opportunity closing date
06 November 2020
Value of contract
£0-100k

About the buyer

Address
Bundesanstalt für Immobilienaufgaben Fasanenstraße 87 Berlin 10623 Germany
Contact
verdingung@bundesimmobilien.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?