Serbia - Railway construction works
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 21 December 2021
- Opportunity publication date
- 21 September 2021
- Category
- 45234100: Ra
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Reconstruction of permanent way and construction of electrification of the railway line Section – Prosek (Sićevo)-Dimitrovgrad (app 82km) on TEN-T Core Network implemented in accordance with FIDIC Contract Conditions for “Plant and Design-Build” (“Yellow Book”).
Scope of the procurement includes design-build activities for reconstruction and modernization of the existing railway line in a length of approximately 82 km and will be consisted (but not limited to) of the following main activities:- Preparation of design documentation as per Serbian regulations.- Reconstruction of the permanent way of the single non-electrified track and belonging facilities from Prosek (Sićevo) to Dimitrovgrad of approx. 82 km.- Construction of the electrification sub-system (including foundations for poles, ducts in tranches along interstation sections and concrete troughs in stations) including two traction sub-stations and 4, sectioning facilities and integration of the existing electrification from Dimitrovgrad to the state border with Bulgaria into the new electrification sub-system.- Connection of the Electro traction substations (ETS) 110/25 kV to the national network of 110 kV.
- Opportunity closing date
- 21 December 2021
- Value of contract
- to be confirmed
About the buyer
- Address
- Joint stock company for public railway infrastructure management: “Serbian Railways Infrastructure” JSC 6, Nemanjina street Belgrade 11000 Serbia
- Contact
- natasa.kosanovic@srbrail.rs
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.