Description
Planning services according to HOAI 2021, section 2 technical equipment, §55, work phases 1, 3 and 5-8
A rectifier substation is required to ensure the traction current supply for the light rail line in the direction of Ludwigshafen-Friesenheim, Ludwigshafen Oggersheim and Ludwigshafen main station. The rectifier substation is to be built at the Friedenspark in Ludwigshafen.The rectifier substation technology is to be housed in a prefabricated concrete building.The technology consists of a medium-voltage switchgear, a traction current transformer, a traction current rectifier, a rectifier control panel which also serves as a return conductor panel, three line feeder panels, a low-voltage main distribution system, a battery system with charging rectifier, an auxiliary power transformer and a telecontrol system.
- Opportunity closing date
- 15 August 2022
- Value of contract
- to be confirmed
About the buyer
- Address
- Rhein-Neckar-Verkehr GmbH Möhlstraße 27 Mannheim 68165 Germany
- Contact
- vergabe@rnv-online.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.