Germany - Installation of heating, ventilation and air conditioning systems
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 16 October 2023
- Opportunity publication date
- 22 August 2023
- Category
- 45331000
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Stadtwerke Ludwigsburg-Kornwestheim GmbH is planning to build a new energy center to supply heat and electricity to the large district heating network, with the possibility of connecting other surrounding areas in the future.The new network connection to be created will enable the integration of heat from renewable energies (biomethane).The planned location of the Waldäcker energy center is to the west of Ludwigsburg.According to the current status, a generator concept with biomethane combined heat and power units (CHP) and a natural gas combined heat and power unit for the generation of electricity and heat is planned for the Waldäcker 3 energy center, consisting of the following main plant components:- 1 x highly efficient combined heat and power unit with approx. 999 kW(electrical to cover the self-supply and the power supply of the heat pumps)- 2 x high-efficiency cogeneration by means of biomethane block-type thermal power stations,each with 4.5 MW electrical- 2 heat pumps with efficient integration for the waste heat utilization of:- third stage exhaust gas (exhaust gas outlet temperatures of approx. 40 °C)- room air utilization of the CHP plants- utilization of the second mixture cooling stage II (GK II) of the CHP plants- the total output of both heat pumps amounts to approx. 3,650 kW- 4 x heat accumulators with approx. 250 m³ content each- natural gas boiler to cover the supply in case of peak load or in case of failure of a large CHP plant with approx. 10 MW
Heating technology with heat pumpsSupply, installation, commissioning and maintenance of natural gas boiler (H2 ready) 10 MW2 x heat pumps with a total of 3.6 MW,connections of 3 x CHP plants.Including:- Natural gas boiler with burner,10 MW th (H2 ready)- 2 x exhaust gas silencers, sound insulation hood for burner- Stainless steel exhaust gas lines approx. 20 meters from DN 900 - DN 950- 2 x heat pumps with a total of 3.6 MW th- 3 x room air cooler- gas supply with piping and fittings- ventilation for heat pump room- approx. 20 control valves up to DN 200- 20 heating pumps- ca.150 fittings DN 15 to DN 300- ca.12 expansion vessels- spray pipe degassing- installation of foreign material (e.g. BHKW, accessories)- steel piping, ca. 200 meters DN 250 - DN 300- steel piping, ca. 600 meters DN 100- DN 200- steel piping, ca. 800 meters DN 15 - DN 80- sanitary 1 WC, WT with accessories- ca. 200 meters stainless steel piping- pipe support systems
- Opportunity closing date
- 16 October 2023
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadtwerke Ludwigsburg - Kornwestheim GmbH Gänsfußallee 23 Ludwigsburg 71636 Germany
- Contact
- ralf.bender@swlb.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.