Switzerland - Generating sets with spark ignition engines

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
19 August 2019
Opportunity publication date
11 July 2019
Category
31121200
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The technical expansion of the new district heating centre comprises 2 double-tube hot water boilers with a total capacity of around 64 MW. The boilers will be equipped with 4 dual fuel burners (oil/gas) and 2 gas cogeneration units with a thermal output of around 4 MW. The plant also has a 200 m³ hot water storage tank, an expansion plant and the associated feed pumps, apparatus and piping. The maximum operating pressure and hot water temperature can be estimated at 16 bar and 180 oC respectively. The fuel supply in the heating oil sector is carried out on site, the gas supply is pipe-bound. The entire plant is fully automated. In addition, the entire system technology as well as the other apparatuses are supplied with the necessary building services trades.

Opportunity closing date
19 August 2019
Value of contract
to be confirmed

About the buyer

Address
Stadt St.Gallen / St.Galler Stadtwerke / Wärme und Contracting St.Leonhard-Straße 15 St. Gallen 9001 Switzerland
Contact
michael.stang@sgsw.ch

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?