Switzerland - Generating sets with spark ignition engines
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 19 August 2019
- Opportunity publication date
- 11 July 2019
- Category
- 31121200
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The technical expansion of the new district heating centre comprises 2 double-tube hot water boilers with a total capacity of around 64 MW. The boilers will be equipped with 4 dual fuel burners (oil/gas) and 2 gas cogeneration units with a thermal output of around 4 MW. The plant also has a 200 m³ hot water storage tank, an expansion plant and the associated feed pumps, apparatus and piping. The maximum operating pressure and hot water temperature can be estimated at 16 bar and 180 oC respectively. The fuel supply in the heating oil sector is carried out on site, the gas supply is pipe-bound. The entire plant is fully automated. In addition, the entire system technology as well as the other apparatuses are supplied with the necessary building services trades.
- Opportunity closing date
- 19 August 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadt St.Gallen / St.Galler Stadtwerke / Wärme und Contracting St.Leonhard-Straße 15 St. Gallen 9001 Switzerland
- Contact
- michael.stang@sgsw.ch
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.