Construction work in the Freudenstein Tunnel on the high-speed line 4080 Mannheim - Stuttgart near Oberderdingen. Lot 1 Part 1 Mains securing approx. 500 running meters of the tunnel roof, drilling work in concrete and rock, injections, exploration, installation of pumps. Lot 1 Part 2 Power supply and other pump cabling, Lot 2 Pump control system