Poland - Engineering design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 15 January 2020
- Opportunity publication date
- 14 December 2019
- Category
- 71320000: Engineering design services
- Value of contract
- £0-100k
- Your guide to exporting
Description
1) Material range: - gas pipeline n/c dn 110 [mm], PE L = approx. 248.0 [m],- gas pipeline n/c dn 90 [mm], PE L = approx. 28.0 [m],- connections n/c dn 63 [mm], PE L = approx. 95.0 [m], pcs. 13 Material range: - gas pipeline n/c dn 110 [mm], PE L = approx. 116.0 [m], - connections n/c dn 63 [mm], PE L = approx. 30.5 [m], pcs. 5 Material range: - gas pipeline n/c dn 110 [mm], PE L = approx. 323.0 [m], - connections n/c dn 63 [mm], PE L = approx. 85.0 [m], pcs. 8,- connections for switching between 50 [mm] bottoms steel, pcs. 1 Material range: - gas pipeline n/c dn 110 [mm], PE L = approx. 168.0 [m], - connections n/c dn 63 [mm], PE L = approx. 101.0 [m], pcs. 13 Material range: - gas pipeline n/c dn 110 [mm], PE L = approx. 352,0 [m],- connections n/c dn 63 [mm], PE L = approx. 128,5 [m], pcs. 12 Material range: - gas pipeline n/c dn 160 [mm], PE L = approx. 262.0 [m], - connections n/c dn 63 [mm], PE L = approx. 12.0 [m], pcs. 3,- connections for switching between 50 [mm] bottom, steel pcs. 1 - gas pipeline n/c dn 110 [mm], PE L = approx. 200,0 [m],- gas pipeline n/c dn 90 [mm], PE L = approx. 102,0 [m],- connections n/c dn 63 [mm], PE L = approx. 202,0 [m], pcs. 18,- connections n/c dn 90 [mm], PE L = approx. 20,0 [m], pcs. 1,- connections for switching between 50 [mm] bottoms, steel pcs. 1
- Opportunity closing date
- 15 January 2020
- Value of contract
- £0-100k
About the buyer
- Address
- Polska Spółka Gazownictwa Sp. z o.o. ul. Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
- Contact
- sylwia.bartoszewicz@psgaz.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.