Poland - Engineering design services
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 20 May 2019
- Opportunity publication date
- 15 April 2019
- Category
- 71320000
- Value of contract
- £0-100k
- Your guide to exporting
Description
Preparation of design, construction and detailed documentation, investor's cost estimate together with supervision of the investor's Ś/c gas pipeline located in Bratoszewice with division into Area I - total length of the gas pipeline L = approx. 2 005 m, Area II - total length of the gas pipeline L = approx. 1 100 m, Area III - total length of the gas pipeline L = approx. 2 470 m. Total length of the gas pipeline for Area I, II, III is L = approx. 5 5 575 m. For each Area, the technical conditions are different. There are three connections to the base gas pipeline. Requires three separate building permits for each Area. Preparation of design, construction and executive documentation, investor's cost estimate and supervision of the investor's Ś/c gas pipeline located in Ruda Bugaj with division into Stage I - total length of the gas pipeline L = approx. 1 761 m, Stage II - total length of the gas pipeline L = approx. The Contracting Authority assumes that the network documentation for Stages I and II will be prepared in two separate studies, for each of the above studies the Contractor will obtain a separate building permit decision.
- Opportunity closing date
- 20 May 2019
- Value of contract
- £0-100k
About the buyer
- Address
- Polska Spółka Gazownictwa Sp. z o.o. ul. Wojciecha Bandrowskiego 16 Tarnów 33-100 Poland
- Contact
- michalina.wasilewska@psgaz.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.