Germany - Demand passenger transport
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 06 December 2023
- Opportunity publication date
- 20 October 2023
- Category
- 60140000
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Local public transport services (AST transports) in the Waldeck-Frankenberg district on the following lines:Lot 1: Line bundle "AST 508": Lines 581.4, 585.2 - 585.5Lot 2: Line bundle "AST 511": Lines 583.1, 583.3 - 583.7
Line 581.4 Korbach - Meineringhausen - Sachsenhausen - Waldeck - AffoldernLine 585.2 Sachsenhausen - Netze - Waldeck - Affoldern - Hemfurth - BringhausenLine 585.3 Naumburg - Netze - WaldeckLine 585.4 Nieder- Waroldern - Deringhausen - Freienhagen - SachsenhausenLine 585.5 Sachsenhausen - Alraft - Ober-Werbe - Nieder-Werbe - Waldeck(for further served districts to the individual lines see attachment to the transport contract "timetables")This line bundle serves districts of the cities and municipalities of Korbach, Waldeck, Edertal and Naumburg.The line 581.4 runs between Korbach and Affoldern via Sachsenhausen and Nieder-Werbe and also serves Waldeck city. In Nieder-Werbe, there is a connection to line 585.1 to Schmittlotheim. The line takes over the service outside the operating hours of line 510. Line 585.2 takes over the service outside the operating hours of bus line 515 between Sachsenhausen and Bringhausen via Netze, Waldeck and Affoldern. Line 585.3, on the other hand, runs between Waldeck and Naumburg via Netze. In Naumburg, there is a connection to bus line 153. In Netze, a transfer from Naumburg to line 515 to Korbach is possible. Line 585.4 runs from Sachsenhausen via Freienhagen to Dehringshausen and on to Nieder-Waroldern. In Nieder-Waroldern, there is a connection to the AST line 581.3 in the direction of Bad Arolsen. And line 585.5 runs in the secondary corridor between Sachsenhausen and Nieder-Werbe via Alraft and Ober-Werbe and on to Scheid.The AST lines run every 60 minutes on all days between approx. 5 a.m. and 1 a.m., provided that no bus or train connection is available at intervals of +/- 30 minutes. If the AST line runs in the course of a scheduled bus line, then the AST only runs outside the operating hours of the bus line or, on weekends, fills up the two-hour basic frequency of the bus line with intermediate trips to the hourly frequency. Furthermore, the AST is used as a feeder service in order to connect the districts lying off the bus routes to the hourly or two-hourly bus lines by changing buses.Internal traffic within an AST corridor, which is usually the defined districts of a municipality, is excluded.Important connection points are: Affoldern and Sachsenhausen as well as Korbach main station.The services with an estimated 50,377 occupied kilometers p.a. can be carried out from the start of operations with 2 vehicles in the vehicle pool as well as an additional vehicle as a short-term amplifier. 1 vehicle has to correspond to the category "minibus" and 1 vehicle to the category "wheelchair bus". Line 583.1 Bad Wildungen - Altwildungen - Reitzenhagen - Anraff - Giflitz - Bergheim - Mehlen - AffoldernLine 583.3 Affoldern - Böhne - Königsheim - Bergheim - Giflitz - Wellen - Wega - Bad WildungenLine 583.4 Bad Wildungen - Odershausen - Braunau - Bergfreiheit - Armsfeld - Battenhausen - DodenhausenLine 583.5 Frankenau - Frebershausen - Reinhardshausen - Bad WildungenLine 583.6 Bad Wildungen - Altwildungen - Reitzenhagen - Reinhardshausen - Albertshausen - Gellershausen - Kleinern - KalkrainLine 583.7 Affoldern - Mehlen - Giflitz - Kleinern - Gellershausen - Frebershausen - Frankenau(for further districts served on the individual lines, see the appendix to the transport contract "Timetables")The line bundle serves districts of the towns and communities of Edertal, Bad Wildungen, Haina (Kloster) and Frankenau. Line 583.1 runs like Line 510 from Affoldern via Bergheim and Giflitz to Bad Wildungen. The line takes over the service outside the operating hours of the bus. Line 583.3 runs from Affoldern via Buhlen, Böhne, Bergheim and Wellen to Bad Wildungen. Line 583.4 has a route from Bad Wildungen via Braunau to Armsfeld and is extended via Hüttenrode, Battenhausen and Haddenberg to Dodenhausen. Line 583.5 runs from Bad Wildungen via Reinhardshausen, Hundsdorf, Frebershausen to Frankenau. In Frankenau, there is a connection to the 584.4 to Frankenberg. Line 583.6 runs a route from Giflitz Kalkrain via Gellershausen to Bad Wildungen. Line 583.7 runs parallel to bus line 516 from Affoldern via Giflitz, Gellershausen and Frebershausen to Frankenau. There is a connection to the line 584.4.The AST lines run on all days between approx. 5 and 1 o'clock in 60 minute intervals, if no bus or train connection is available in the interval of +/- 30 minutes. If the AST line runs in the course of a scheduled bus line, then the AST only runs outside the operating hours of the bus line or, on weekends, fills up the two-hour basic frequency of the bus line with intermediate trips to the hourly frequency. Furthermore, the AST is used as a feeder service to connect the districts lying off the bus routes to the hourly or two-hourly bus lines by changing buses.Internal transport within an AST corridor, which are usually the defined districts of a municipality, are excluded.The services with an estimated 158,990 occupied kilometers p.a. can be carried out from the start of operations with 4 vehicles in the vehicle pool and a further vehicle as a short-term amplifier. 3 vehicles have to correspond to the category "minibus" and 1 vehicle to the category "wheelchair bus".
- Opportunity closing date
- 06 December 2023
- Value of contract
- to be confirmed
About the buyer
- Address
- Energie Waldeck-Frankenberg GmbH Arolser Landstr. 27 Korbach 34497 Germany
- Contact
- info@ewf.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.