Poland - Construction works

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 July 2022
Opportunity publication date
03 June 2022
Category
45000000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject matter of the contract is: Modernization of the thermal centre with the construction of a 2-function thermal centre (central heating + hot water) of the power of 230kW in a multi-family residential building, 1E Witosa Street W2 in Koronowo:- disassembly of the existing (old) thermal centre owned by KPEC,- construction of an exchange centre for the central heating and hot water sections with a capacity of 230kW (from Contractor's own materials),- installation of a new electrical system in the substation room with connection of the switchgear,- grounding of the substation's equalizing busbar,- installation, connection and start-up of the substation to the substation's technological and electrical system. The Ordering Party will provide the Contractor with the electrical switchgear with ECL Comfort 310 controller, to be received from the KPEC Automation Department.
The scope of the contract includes: Dismantling, construction, assembly, connection and commissioning of the heat substation for the building located in Bydgoszcz: substation in building No. 1E W2 Witosa Street NOTE The correct VAT rate should be applied, according to the regulations in force. The order does not include construction works consisting in the adaptation of the node room (e.g. tiles, doors). Construction works shall be performed in compliance with: 1.Principles of technical knowledge, currently binding provisions of the Building Law together with its executive acts and regulations of occupational safety and health."Technical Conditions for the Execution and Acceptance of Construction Works, Part E: Sanitary Installation Works, Book 1 - Heat Distribution Units" published by Building Research Institute". 3.1.Execution of the heat substation with necessary instrumentation (metering, protections, etc.), insulation, Control and Measurement Instruments and Automation, and telemetry, according to the documents indicated in pt IV/2, along with accompanying works and works arising during the contract performance not provided for in the aforementioned documentation but necessary for its execution, taking into account the costs associated with the contract subject execution. 3.Dismantling of the existing (old) heat substation owned by KPEC,4.Connection of the electrical substation - received from the KPEC Automation Department and distribution of the necessary electrical installation, Control and Measurement Instruments and Automation, subject to acceptance,5.Assembly, connection and start-up of the heat substation to the technological installation (central heating, 6.The contractor should include the full scope of electrical and Control and Measurement Instruments and Automation works, which enable commissioning of the heat substation, in accordance with the applicable regulations. 7.Providing instructions for the user of the constructed heat substation. 8.Preparation and agreement with KPEC (Department of Conditions and Documentation) of the operation manual for the constructed heat substation. As-built documentation should include the operation manual for the constructed node agreed upon by KPEC, along with a protocol of agreement. 9. Application of Control and Measurement Instruments and Automation devices communicating with the monitoring system used by KPEC via Modbus TCP protocol. 10. Performing initial adjustment and parameterization of controllers and introducing design settings. 11. Performing initial adjustment of the CH pump and configuration for the KPEC monitoring system. 12.12. Drawing up a commissioning protocol of AKPiA (Control and Measurement Instruments and Automation) with a map of parameter registers for the KPEC monitoring system. 13. Drawing up a list of main devices of the constructed node (including technical parameters, types, manufacturer and quantity) and forwarding it in an editable version to the TI department (e-mail: inwestycje@kpec.bydgoszcz.pl) on the day of the final acceptance at the latest.Supplying the Contracting Authority with as-built documentation prepared by authorized: designer and verifier (2 copies in hard copy and 1 copy in electronic version) - according to appendix no. 1 to the contract.

Opportunity closing date
06 July 2022
Value of contract
to be confirmed

About the buyer

Address
Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. ul. Ks. J. Schulza 5 Bydgoszcz 85-315 Poland
Contact