Poland - Construction work for water and sewage pipelines Construction work for water and sewage pipelines

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 August 2019
Opportunity publication date
11 July 2019
Category
45231300: Construction work for water and sewage pipelines
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Task 1 - Construction of a water supply network in the city of Warsaw. Cherry tree for supplying buildings from 71A to 72A:Z1 - Z2: water supply system with a length of approx. 25.5 m from three-layer polyethylene pipes PE100, SDR 11 PN16 with a diameter of Ø 125/11.4 mm,Z2 - W2: water supply system with a length of approx. 60.5 m from three-layer polyethylene pipes PE100 RC, SDR 11 PN16 Ø 125/11.4 mm, controlled drilling Z8 - W4: water supply system approx. 27.5 m long from three-layer polyethylene pipes PE100, SDR 11 PN16 Ø 125/11.4 mm,Z1 - W1A: water supply system approx. 45.0 m from three-layer polyethylene pipes PE100, SDR 11 PN16 Ø 125/11.4 mm,Installation of hydrants, tees and sliders in order to connect the anticipated connections to the buildings.b) Task 2 - Construction of a water supply network in the city centre. Dąbrowa by the road at the border of the Masłów village First - road to the tanks of pressure zone III: Ki - 1: water supply system of approx. 3.5 m length, including thermal insulation installed at the factory, approx. 2.2 m, from spheroidal cast iron ductile cast iron pipes of class C40 with a diameter of Ø 150 mm and blocked connections of the Standard Vi,1 - 10 system: water supply system with a length of approx. 316.0 m from three-layer polyethylene pipes PE100, SDR 11 PN16 with a diameter of Ø 180/16.4 mm,2 - 2.4 water supply system with a length of approx. 74,5 m of three-layer polyethylene pipes PE100, SDR 11 PN16 with a diameter of Ø 125/11,4 mm,Replacement of a Ø 400/150 cast iron teescope and Ø150 cast iron gate valve in front of chamber Ki,Replacement of Ø150 pipelines and complete Ø100 and Ø80 fittings in chamber Ki,Liquidation/permanent shutdown of the existing water supply Ø110 and Ø90 from the existing ones. Ki chamber to point 4,Overvoltage of existing connections to building No. 35a on plot No. 1064/3 and building No. 36b on plot No. 1065/4,Installation of hydrants and tee-pieces and sliders to connect the anticipated connections to the buildings.c) Task 3 - Construction of a water supply network in the city centre. Mąchocice Kapitulne, Ameliówka: 1 - 10 - 16: water supply system with a length of approx. 446.5 m from three-layer polyethylene pipes PE100, SDR 11 PN16 with a diameter of Ø 180/16.4 mm,10 - j - 83 - Hp14: water supply with a length of approx. 1 112.5 m of three-layer polyethylene pipes PE100, SDR 11 PN16 of Ø 125/11.4 mm,18 - Hp6: water supply system of approx. 417.5 m length of three-layer polyethylene pipes PE100, SDR 11 PN16 of Ø 125/11.4 mm,34 - Hp7: water supply system of approx. 150.5 m of three-layer polyethylene pipes PE100, SDR 11 PN16 with a diameter of Ø 125/11.4 mm,Execution of a complete water pumping station with power supply and land development,Execution of a reduction chamber KR10 with equipment.Installation of hydrants, tees and sliders to enable later connection of connections.A detailed description of the subject of the contract is presented in Part I of the ToR - Instructions for Contractors and Part III of the ToR - Description of the subject of the Order (ToR), available on the Ordering Party's website.

Opportunity closing date
21 August 2019
Value of contract
to be confirmed

About the buyer

Address
Wodociągi Kieleckie Sp. z o.o. ul. Krakowska 64 Kielce 25-701 Poland
Contact
wodkiel@wod-kiel.com.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?