Germany - Construction work for school buildings

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 October 2019
Opportunity publication date
19 September 2019
Category
45214200: Construction work for school buildings
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

- 60,000 m2 knock off plaster, inside, walls, - 40,000 m2 knock off plaster, inside, ceiling, - 38,000 m2 substrate preparation, seal inner wall, EG, - 38,000 m2 wall connection, sealing slurry, EG, - 1 367,000 m2 wall surface remove paint layers, dry, - 1 367,000 m2 wall surface clean, damp, - 340,000 m2 dispersion coating remove, hot steam, plaster, wall, - 50,000 m2 remove oil paint coating, plaster, wall, - 35,000 m2 remove oil paint coating, hot steam, plaster, wall, - 1 022,000 m2 arch surface remove paint layers, dry, - 1 022,000 m2 arch surface clean, moist, - 330,000 m2 remove dispersion coating, hot steam, plaster, arch, - 600,000 pcs. Remove small iron parts, close holes,- 640,000 m2 Clean walls with salt load, scrape out joints, brick masonry,- 157,000 m2 Clean walls with salt load, scrape out joints, natural stone,- 1 774,000 m2 Primer, absorbent substrate.Restoration plaster:- 640,000 m2 Grouting brick masonry,- 157,000 m2 Grouting natural stone masonry,- 887,000 m2 Spraying plaster,- 887,000 m2 Porous base plaster layer,- 887,000 m2 Restoration plaster layer - Smoothed,- 282,000 m Restoration plaster, reveal.lime, lime cement plaster:- 1 074,000 m2 Levelling plaster, unevenness,- 40,000 pcs. Interior plaster small area, up to 0,25 m2,- 65,000 pcs. Interior plaster small area, up to 0,50 m2,- 42,000 pcs. Interior plaster small area, up to 1,50 m2,- 42,000 pcs. Interior plaster small area, up to 2,50 m2,- 3 606,000 m2 plaster base, cardboard underlay, interior wall,- 466,000 m2 lime plaster, 2-layer, interior wall new,- 498,000 m2 lime plaster, 2-layer, interior wall existing mixed masonry, ground floor,- 1660,000 m2 walls ground floor, filling full surface with fabric, Q3,- 3 140,000 m2 lime plaster, 2-layer, interior wall masonry and framework,- 3 140,000 m2 plaster reinforcement, glass fibre fleece, interior plaster wall, - 680,000 m lime plaster, 2-ply, reveal, interior plaster, - 153,000 m lime plaster, 2-ply, window sill plaster, - 2 120,000 m plaster work, - 680,000 m plaster edge, reveal, manufacture, straight, - 460,000 m plaster edge, reveal, manufacture, round arch, - 470,000 pcs. Repair plaster damage, walls - 162,000 m plaster base, timber framework, interior - 250,000 m2 economy formwork, ceiling, on wooden substructure, 24 mm - 665,000 m2 plaster base, reed mats, for ceiling plaster - 665,000 m2 lime plaster, 2-layer, ceiling, interior - 35,000 pcs. Lime plaster, cross vault ceiling repair, up to 0,25 m2,- 25,000 pcs. Lime plaster, cross vault ceiling repair, up to 0,50 m2,- 8,000 pcs. Lime plaster, cross vault ceiling repair, up to 1,50 m2,- 5,000 pcs. Lime plaster, cross vault ceiling repair, up to 2,50 m2,- 15,000 m repair cracks, interior plaster, cross vault,- 1 022,000 m2 cross vault ceiling, filling full area with fabric, Q3,- 1 022,000 m2 allowance, execution on ceilings, vaulted, interior,- 1 980,000 m trowel cut, joints,- 810,000 m slot Elt cables milled, up to 10 cm2,- 810,000 m slot Elt cables milled, up to 30 cm2,- 810,000 m slot plastered, up to 10 cm2,- 450,000 m slot plastered, up to 30 cm2,- 14,000 pcs. Plaster wall breakthrough, up to 1 000 cm2, inside, - 12,000 pcs. Plaster ceiling opening, 300-1 000 cm2, inside, - 56,000 m Edge protection, existing plaster, - 984,000 m Window- and flooring plaster door elements, inside - plaster 555,000 m windows, inside, straight 40/70 mm - plaster 149,000 m windows, inside, segment arch 40/70/80 mm - 6,000 m2 allowance for processing belt arches, B = 35 cm - 18,000 m2 allowance for processing belt arches, B = 65 cm - 41,000 m2 allowance for processing belt arches, B = 85 cm - 39,000 m2 allowance for processing belt arches, B = 105 cm. - 2 080,000 m2 Check paint coat/younger coating - wall, - 2 080,000 m2 wall surface remove paint layers, dry, - 2 080,000 m2 wall surface clean, moist, - 240,000 m2 remove dispersion coating, superheated steam, plaster, wall, - 50,000 m2 remove oil paint coating, plaster, wall, - 35,000 m2 oil paint coating, hot steam, plaster, wall,- 842,000 m2 paint layer/ check younger plaster - ceiling,- 842,000 m2 ceiling area remove paint layers, dry,- 842,000 m2 ceiling area clean, damp,- 89,000 m2 allowance, execution, curved, segment arch window,- 12,000 m2 allowance, execution, curved, segment arch wall niches,- 39,000 m2 allowance, execution, curved, segmental arch, door reveals, - 2 080,000 m2 check plaster, surface strength wall, - 842,000 m2 check plaster, surface strength ceiling, - 45,000 m2 removal of solid plaster layers, - 390,000 m2 wall, hollow areas remove plaster, - 276,000 m2 ceilings, hollow areas remove plaster, - 65,000 m edge protection existing plaster,- 103,000 m2 stabilization of hollow plaster wall, injection,- 84,000 m2 stabilization of hollow plaster ceiling, injection,- 200,000 m2 stabilization of hollow plaster wall, mechanical,- 100,000 m2 stabilization of hollow plaster ceiling, mechanical,- 85,000 m rehabilitation cracks, interior plaster, b. 20 mm, wall - 64,000 m Refurbishment Cracks, interior plaster, overlay, etc. 20 mm, wall, - 70,000 m renovation cracks, interior plaster, b. 20 mm, ceiling, - 70,000 m renovation cracks, interior plaster, ΓΌ. 20 mm, ceiling.lime, lime cement plaster:- 95,000 m2 lime plaster, 2-layer flaws, the hist. surfaces, ceiling up to 2,0 m2,- 190,000 m2 lime plaster, 2-layer defects, the hist. Surfaces, ceiling over 2,0 m2,- 225,000 m2 extra thickness, plaster, interior, ceiling, 5,0 mm,- 811,000 m2 finishing plaster, fine lime plaster, smoothed, hist. Surfaces ceiling, - 32,000 m2 lime plaster, 2-layer, interior wall addition, up to 2,0 m2, - 64,000 m2 lime plaster, 2-layer, interior wall addition, over 2,0 m2, - 16,000 m cove / cove, development up to 200 mm, renew, - 12,000 pcs. Cove / cove, training corners.protection of historical paintings and plaster:- 1 902,000 m2 cleaning historical. Existing plaster, dry, wall,- 1 902,000 m2 Consolidation hist. Sockets and plasters, wall, - 811,000 m2 Consolidation hist. Mountings and plasters, ceiling, - 2 103,000 m2 painter's fleece as protective layer, wall, - 811,000 m2 painter's fleece as protective layer, ceiling.- Interior stucco repair work:- 1,000 psch Documentation for removal of stucco parts,- 1 158,000 m Clean stucco profiles, dry,- 359,000 m Repair and re-profile ceiling rod, 350 mm,- 387,000 m Repair and re-profile wall rod, 450 mm,- 203,000 m ceiling rod profiled, unfolding up to 350 mm,- 65,000 m additional expenditure curved profiles, 150,- 94,000 m additional expenditure curved profiles, 300,- 73,000 m additional expenditure curved profiles, 450,- 27,000 pcs. Stucco corner, mould ceilings, rectangular, offset piece, 150 mm, - 27,000 pcs. Stucco corner, mould ceilings, rectangular, offset piece, 300 mm, - 27,000 pcs. Stucco corner moulding ceilings, rectangular, offset, 450 mm, - 67,000 m profiled wall rod, unwinding 150 mm, - 67,000 m profiled wall rod, unwinding 300 mm, - 67,000 m profiled wall rod, unwinding 450 mm, - 150,000 m back anchorage stucco profiles walls, - 185,000 m back anchorage stucco profiles ceiling, - 45,000 pcs. Close joints Stucco profiles, 150 mm, - 45,000 pcs. Close joints Stucco profiles, 300 mm, - 45,000 pcs. Close joints stucco profiles, make 450 mm, - 6,000 pcs. table template, - 1 029,000 m shadow gap ceiling stucco, b: 2 cm.

Opportunity closing date
23 October 2019
Value of contract
to be confirmed

About the buyer

Address
Stadtverwaltung Gera Zentr. Vergabe- u. Submissionsstelle Kornmarkt 12 Gera 07545 Germany
Contact
ausschreibung.submission@gera.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?