France - Construction work for industrial buildings

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
31 May 2023
Opportunity publication date
19 April 2023
Category
45213250
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Construction of an industrial electrical building " Source Station (PS) ", on 3 levels and a semi-buried floodable technical space (about 1884 m2 SDP) and construction of an industrial electrical building " Substation Metal Envelope (PSEM) ", on 4 levels and a semi-buried floodable technical space (about 614 m2 SDP)
> Description of the works: Construction of industrial electrical buildings "source station" and "PSEM", on 4 levels and a level of semi-buried floodable technical void (2498 m2 SDP) > Program of works: 3 buildings transformers R+3, including each one:- 1 concrete cell for ONAN transformer- 1 HTA grid room- 1 fire protection room- 2 ventilation rooms- 1 floodable recess for cable passage- 1 bubbling tank and buried overflow- 1 external staircase- 1 delivery platform- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot- 1 underground parking lot Terraces and green roof - Connection works such as buried gutters/shutters - Elevated footbridge linking the buildings - 1 PSEM building R+4 - 1 PSEM room - 1 generator room - 1 unloading dock - 1 relay room - 1 ventilation room - Process rooms : 1 battery room, 1 UA room, 1 rectifier room- Social rooms : 1 social room, 2 cloakrooms/sanitary rooms- 1 interior staircase- 1 floodable recess for cable routing- 1 buried EP retention basin- Terraces and green roof- 1 HTA trainset building R+2- 1 control-command room- Process rooms: 1 battery room, 1 UA room, 2 TSA rooms, 1 rectifier room, 1 TCFM room- 10 ½ HTA trainset rooms- Social rooms: 1 meeting room, 1 social room, 2 cloakrooms/sanitary rooms- 1 interior staircase and delivery bays- Ventilation corridor- Terraces and green roof- 1 autotransformer/condenser platform- 1 underground EP retention basin- Connection works such as underground gutters/shutters- 1 underground HTA gallery (on 2 levels)Landscaping of the siteNote: all the buildings are built on piles above the Seine flood level R1.15> Specific works: Foundation by piles, support by lutetian walls, low floor, possible lowering of the water table, casing of the basement premises. Creation of a duplex underground gallery for cable passage in a shielded trench. Creation of concrete HV and multitubular HTA ducts. Reinforced concrete structure, including high walls (10.30 m high) for the transformer cells. Specific grounding network for Enedis and RTE at the bottom of the excavation and around the perimeter, as well as in all the premises. Expansive green roofs (50cm high ground). Façades in tubes and metal cassettes. Exterior joinery in frames and steel curtain wall CF60 to 120. Numerous works of ironwork (grids, gratings, facade cladding). Hydraulic CF hatches. Irons, hoists and overhead crane. Motorized CF dampers. Metal doors and anti-explosion doors. Realization of heavy roadway. Consequent landscaping.> Specific points of the work site:- Work site with complex phasing (construction/demolition) and extended in time- Work site in dense residential urban environment, opposite a school- Work site close to live electric works- Site in floodable zone, project conceived in the respect of the PPRI- Clean work site charter> Provisional phasing of the works:GC Phase 1: Construction of the PSEM building + TR613 lodge and HTA building: February 2024 to December 2025Interruption 1 : January 2026 to December 2027 (24 months of interruption)GC Phase 2: Demolition of BI and construction of TR611 lodge: January 2028 to November 2028Interruption 2: December 2028 to May 2030 (18 months of interruption)GC Phase 3: Demolition of old 611/612 lodges and construction of TR612 lodge: June 2030 to June 2031Interruption 3: July 2031 to July 2032 (12 months of interruption)GC Phase 4: Demolition of old HTA building & development of green spaces: August 2032 to January 2033

Opportunity closing date
31 May 2023
Value of contract
to be confirmed

About the buyer

Address
Enedis Tour Enedis 34 Place des Corolles COURBEVOIE PARIS LA DEFENSE 92079 France
Contact
aurelien.aznar@enedis.fr

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?