Norway - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
17 January 2022
Opportunity publication date
10 December 2021
Category
45000000: Co
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Upgrades will be carried out for the electrical and technical control installations, site and construction engineering in the Damsgård and Nygård tunnel.The Damsgård tunnel is 2342/2360 metres long and was opened in 1993.Tunnel profile: 2 x T9.5Free height 4.5 metresWidth: 2 X 3.25 m (driving lane width)Maximum gradient: 1 %Average annual daily traffic/AADT 2020: 42,000Portion of heavy traffic: 9%Speed limit: 80 km/h, 70 and 50 km/h for the exit facing eastThe Nygård tunnel is 865 metres long and was opened in 1999.Tunnel profile: T9.5Free height 4.5 metresWidth: 2 X 3.25 m (driving lane width)Max gradient: 5 %Average annual daily traffic/AADT: 100,000Portion of heavy traffic: 8%Speed limit: 60 km/h

Opportunity closing date
17 January 2022
Value of contract
to be confirmed

About the buyer

Address
Statens vegvesen Skoggata 19 Moss 1500 Norway
Contact
firmapost@vegvesen.no

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?