Poland - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 December 2023
Opportunity publication date
28 October 2023
Category
45000000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The scope of the contract includes execution of project documentation, expansion and modernization of GPZ Rawicz and GPZ Gora, as well as commissioning and commissioning.In order to carry out the work, it is necessary to obtain all opinions, agreements, consents, decisions, permits, etc. required by applicable law.
Station 110/20/15 kV Rawicz1. Addition of a 110 kV line field in the 110 kV splitter along with secondary circuits - next to the 110 kV line field in Bojanowo direction.2. Modernization of the 110 kV line field in Żmigród direction along with secondary circuits.3. Modernization of the 110 kV bus coupler field along with secondary circuits.4. Modernization of the control room along with protection and measurement cabinets, etc.5. Repositioning of the 110 kV Bojanowo line into the newly constructed line field in order to eliminate crossings in the foreground of the station.6.. The freed field of 110 kV line Bojanowo direction to be used for introduction of 110 kV line Mountain.7. Construction of sealed bays under 110/15 kV transformers along with de-oiling system and rainwater drainage.8. Adaptation of internal roads to the new layout of 110 kV switchgear.9. Build SOT.10.The Contractor shall obtain a water permit for groundwater extraction and notify the Polish Water Authority of the water extraction device. The Contractor shall submit the permit and notification to the Contracting Authority.11.Disassembly and disposal of equipment.The scope of disassembly, disposal shall be agreed with the Supervising Inspector on an ongoing basis, and the materials from the disassembly for further use shall be transferred to the place indicated by the Contracting AuthorityStation 110/20 kV Mountain1. Construction of a new 110 kV switchgear in the H5 system along with secondary circuits.2. Modernization of the control room along with protection and measurement cabinets.3. Construction of sealed transformer bays along with de-oiling and rainwater drainage systems.4. Installation of a 110/20 kV transformer with a capacity of 16 MVA (investor supply) and the existing transformer at the new bays.5.. Modernization of bays 1 and 31 and 15 and 17, as well as 5 and 27 and 3 and 29 of the 20 kV switchgear - bays Tr 1 and 2 and the 20 kV bus coupler, as well as ZU 1 and ZU 2 and Measurement 1 and Measurement 2.6. Construction of new cable connections of 110/20 kV transformers with the 20 kV switchgear.7.Construction of new ZU stands with sealed stands connected to the de-oiling system.8. Extension of internal roads, external lighting.9. Construction of a fire shelter.10. Construction of SOT.11. Dismantling and disposal of equipmentThe scope of dismantling, disposal to be agreed with the Supervising Inspector on an ongoing basis, and the materials from the dismantling for further use should be transferred to the place indicated by the Employer.

Opportunity closing date
06 December 2023
Value of contract
to be confirmed

About the buyer

Address
ENEA Operator sp. z o.o. ul. Strzeszyńska 58 Poznań 60-479 Poland
Contact
lukasz.kwiatkowski@operator.enea.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?