Germany - Construction services in building construction

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
15 April 2019
Opportunity publication date
14 March 2019
Category
45210000, , , , , ,
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The ensemble is structured as follows:(1) main building / centre wing;(2) with rear wing extensions;(3) northern or southern side wing, Lützowsches Palais;(4) southern side wing;(5) drawbridge/timbered building, in the rear area of the southern side wing.Description of the measure:1) Dismantling of the existing roof covering area (1), (2n), (2s);2) Dismantling of the entire fire-damaged and wood-preservant-loaded roof structure;3) Reconstruction and new construction of ceiling beam layers, ceiling EG/1.OG and 1.OG/DG, rearward northern side wing (2n);4) Reconstruction of ceiling beam layers, ceiling EG/1.OG and 1.OG/DG, main or central wing (1), incl. rearward southern side wing (2s);5) Accompanying reconstruction of the eaves cornice, i.e. securing and/or new brickwork, incl. Renewal of the ceiling beam support partially located in the masonry, in accordance with the structural design or wood preservation survey;6) Joining of the new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the slide-on elements;7) Watertightness due to the installation of a fabric-reinforced, highly diffusion-open underlay membrane, incl. the installation of a new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the slide-on elements;7) Watertightness due to the installation of a fabric-reinforced, highly diffusion-open underlay membrane, incl. the installation of a new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the installation of the new roof structure. 8) covering the entire roof surface plus the roof plumbing work of the main or central wing (1), including the rear northern (2n) and southern side wings (2s);9) during construction, wood preservation measures are carried out in accordance with the damage register of the wood preservation report, i.e. Infestation foci are rebuilt and cleaned, constructive and combating wood protection measures are carried out in the area of the main and middle wings (1), rear northern (2n) and rear southern side wings (2s);10) Renovation of the adjacent half-timbered structures of the shed (5), such as the southern gable incl. 3 containers in northern direction. The ensemble is structured as follows:(1) main building / centre wing;(2) with rear wing extensions;(3) northern or southern side wing, Lützowsches Palais;(4) southern side wing;(5) drawbridge/timbered building, in the rear area of the southern side wing.Description of the measure:1) Dismantling of the existing roof covering area (1), (2n), (2s);2) Dismantling of the entire fire-damaged and wood-preservant-loaded roof structure;3) Reconstruction and new construction of ceiling beam layers, ceiling EG/1.OG and 1.OG/DG, rear northern side wing (2n);4) Renovation of ceiling beam layers, ceiling EG/1.OG and 1.OG/DG, main and middle wing (1), incl. rear southern side wing (2s);5) accompanying renovation of the eaves cornice, i.e. securing and/or new brickwork, including renewal of the ceiling beam support partially located in the masonry, in accordance with structural design or wood preservation survey;6) joinery of the new roof structure, i.e. 7) establishing the tightness against driving rain by laying a fabric-reinforced, highly diffusion-open underlayment, including laying the battens;8) covering the entire roof surface plus the roofing membrane, including the roofing battens;7) installing the roofing membrane, including the roofing membrane, with a high degree of diffusion-tightness, by means of the installation of a fabric-reinforced, highly diffusion-open underlayment, including the installation of the supporting battens;8) covering the entire roof surface plus the roof battens, including the installation of the roof battens;8) installing the roof battens, including the roof battens, with the roof battens, with the roof battens, with the roof battens being laid. of the roof plumbing work of the main or central wing (1), including rear northern (2n) and southern side wings (2s);9) during construction, wood protection measures are carried out in accordance with the damage register of the wood protection expert opinion, d. h. Infestation foci are rebuilt and cleaned, constructive and combating wood protection measures are carried out in the area of the main or middle wing (1), rear northern (2n) and rear southern side wing (2s);10) Renovation of the adjoining half-timbered structures of the shed (5), such as the southern gable incl. 3 containers, in northern direction The ensemble is structured as follows:(1) main building / middle wing;(2) with rear wing extensions;North or southern;(3) northern side wing, Lützowsches Palais;(4) southern side wing;(5) drawbridge/timbered building, in the rear area of the southern side wing.description of the measure:1) dismantling of the existing roof covering area (1), (2n), (2s);2) dismantling of the entire fire-damaged and wood preservative-loaded roof structure;3) Reconstruction and new construction of ceiling beam layers, ceiling EG/1.OG and 1.OG/DG, rearward northern side wing (2n);4) Reconstruction of ceiling beam layers, ceiling EG/1.OG and 1.OG/DG, main or central wing (1), incl. rearward southern side wing (2s);5) Accompanying reconstruction of the eaves cornice, i.e. securing and/or new brickwork, incl. Renewal of the ceiling beam support partially located in the masonry, in accordance with the structural design or wood preservation survey;6) Joining of the new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the slide-on elements;7) Watertightness due to the installation of a fabric-reinforced, highly diffusion-open underlay membrane, incl. the installation of a new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the slide-on elements;7) Watertightness due to the installation of a fabric-reinforced, highly diffusion-open underlay membrane, incl. the installation of a new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the new roof structure, i.e. joinery of the roof truss and the rafters, incl. installation of the installation of the new roof structure. 8) covering the entire roof surface plus the roof plumbing work of the main or central wing (1), including the rear northern (2n) and southern side wings (2s);9) during construction, wood preservation measures are carried out in accordance with the damage register of the wood preservation report, i.e. Infestation foci are rebuilt and cleaned, constructive and combating wood protection measures are carried out in the area of the main and middle wings (1), rear northern (2n) and rear southern side wings (2s);10) Renovation of the adjacent half-timbered structures of the shed (5), such as the southern gable incl. 3 containers in northern direction.

Opportunity closing date
15 April 2019
Value of contract
to be confirmed

About the buyer

Address
VEWOBA Wohnungsbaugesellschaft Ludwigslust GmbH Schlachthofweg 3 Ludwigslust 19288 Germany
Contact
submission@swsn.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?