Belgium - Construction of wastewater treatment plants

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
01 August 2022
Opportunity publication date
03 June 2022
Category
45252100: Se
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

see II.2.4
The object of this contract is the renovation of the Wasmuël wastewater treatment plant on the territory of the Commune of Quaregnon. The plant has a treatment capacity of 250,000 PE at present. The renovation consists mainly of bringing the works into conformity with the code on well-being at work, repairing the concrete, replacing obsolete electromechanical equipment, preparing the installation of an odour treatment system. It also involves the construction of a shed above the existing grit chambers. The construction of this shed is necessary for the treatment of odors and the execution of the work generates significant CO2 emissions. IDEA has the ambition to reduce these CO2 emissions during the execution of its public contracts. The realization of this ambition is only possible through the active efforts of its contractors. For this reason, this procurement includes the CO2 Performance Ladder methodology, which rewards bidders who make efforts to reduce their CO2 emissions with an advantage in the award criteria. The contractual provisions for the CO2 Performance Ladder methodology are set forth in Sections 2. Award Criteria, Y (Conditions of Performance) and Section 45 Penalties of these specifications. More information on the CO2 performance scale is available at www.echelledeperformanceCO2.beLieu. The type of network on which the work is carried out, in accordance with B.1, is III.The work includes in particular:Preparatory works- Site surveys- Preliminary identification of impediments- Tree felling, grubbing, clearing of undergrowth- Demolition of roads with hydrocarbon coating- Modifications to energy and water connections and links The modification of the entrance work - The execution studies based on the market guide plans - Earthworks, shoring and water control - Demolitions - Realization of reinforced concrete civil works cast in place and prefabricated - Repairs of concrete - Electromechanical equipment Rehabilitation of the two existing grit chambers - Execution studies on the basis of the market guide plans - Earthworks, armouring and control of soil and waste water - Demolitions - Realization of the civil works in reinforced concrete cast in place and prefabricated - The repairs of the concrete - The electromechanical equipments - The establishment of the various pipelines - The connections and energy links - The rehabilitation of the two existing grit chambers Demolitions - Construction of reinforced concrete civil works cast in place - Concrete repairs - Electromechanical equipment - Establishment of various pipelines - Energy connections and links - Construction of a new technical room - Construction of a shed for the treatment of odors from the grit chambers The development of the surroundings The development of the sidewalks of access and interior to the station as well as the realization of the surroundings of the concerned works (sidewalks, fence and turfing, plantations) The evacuation of waste.The realization of the tests of reception.The supply of the file as built of realization.The assembly of the file DIU.The works described above are not exhaustive, the detail of the works is taken again in the technical clauses and the recapitulative metre appended to the present special schedule of conditions.Within the framework of the present market, the contracting authority intends to fight against the social dumping and the ...(see documents of the market)

Opportunity closing date
01 August 2022
Value of contract
to be confirmed

About the buyer

Address
Intercommunale IDEA - DER Rue de Nimy, 53 Mons 7000 Belgium
Contact
info@idea.be

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?