Germany - Construction of railway workshops
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 30 July 2019
- Opportunity publication date
- 19 June 2019
- Category
- 45234180: Construction work for railways workshop
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Type and scope of services:- Removal of asphalt surface pavement 1 655 m2,- Pick up natural stone paving, store approx. 120 m2,- Removal of topsoil, intermediate storage, re-installation, delivery in total approx. 40 m3,- Removal of soil/ base layers, disposal approx. 300 m3,- Removal of soil/ base layers for pipe trenches, disposal approx. 1 250 m3,- Installation of RC ballast as filling soil on site approx. 685 m3,- Laying lawns and finishing care approx. 110 m2,- Installation of new sheet piling as permanent supporting wall 88 running metres,- Construction of back anchoring and covering,- Laying drainage pipes for rainwater and sewage incl. filling the pipe zone 430 m,- Installation of inspection shafts for drainage pipes 13 pc,- Construction of the intake structure of the water-bearing trench, demolition, integration of a new muzzle pipe and reconstruction of the bank wall. Approx. 4 080 m³ excavation excavation; approx. 407 m³ foundation excavation; approx. 1 240 m³ backfilling with existing recycling material; approx. 1 011 m2 trench excavation and backfilling for supply and drainage pipes; approx. 135 m drainage channels DN 100, Kl. D; approx. 92 m drainage pipes PVC-KG, DN 100; approx. 225 m drainage pipes PP, DN 100; approx. 53 m drainage pipes PE, up to DN 150, welded; 1 light liquid separator class I, size NS 20, incl. sampling chamber; 1 pc. Double pump station; underground supply lines (approx. 130 m drinking water line, PE; approx. 55 m heating line, 2x 32 mm, in jacket pipe; approx. 49 m supply air line, PP, up to DN 500; 132 m compressed air line, stainless steel); approx. 162 m³ strip foundations, reinforced concrete, C 20/25; approx. 428 m³ block foundations, reinforced concrete, C 25/30, with formwork quiver; approx. 560 m2 floor slabs for working pits, reinforced concrete, up to 42 cm thick, C 30/37, FD; approx. 447 m2 Walls for working pits, reinforced concrete, 30 cm thick, C 30/37, FD; incl. joints according to WHG approval; approx. 755 m2 Foam glass insulation, d = 40 mm; approx. 920 m2 Floor slab for maintenance hall, C 30/37, 25 cm thick; approx. 478 m2 floor slab workshop/warehouse, C 25/30, 25 cm thick; approx. 271 m2 floor slab office building, C 20/25, 12 cm thick; earthing system, consisting of approx. 850 m ring earth electrode and connecting cables, d= 10 mm, V4A, 490 m foundation earth electrode, steel, d= 10 mm. Approx. 980 m2 external walls, prefabricated solid wall panels, d= 24 cm; approx. 890 m2 internal walls, prefabricated solid wall panels, d= 20 cm; approx. 1 148 m2 fully assembled ceilings, prestressed concrete hollow panels, d= 25 cm; 6 pcs. prefabricated staircases/platforms; 50 pcs. Precast columns, up to 60/60 cm, up to 11.65 m long; approx. 171 m precast base elements, insulated, d = 280 mm, up to 1.28 m high; 6 reinforced concrete sump trays for rail vehicles, up to 7.48 x 3.80 x 0.60 m; 2 reinforced concrete sump trays for road vehicles, up to 8.00 x 4.00 x 0.39 m; approx. 85 m2 service plates for petrol station, with WHG approval. Track:- 753 m3 soil pick up and dispose,- 933 t base ballast installation,- 837 m track installation,- 360 m rail installation,- 1 381 t backfilling ballast installation,- 837 m shunting path construction,- 4 pieces of brake buffer blocks type 4 installation.Switches:- 185 m3 soil take up and disposal,- 230 t base ballast install,- 7 pieces of switches including long sleeper parts install,- 382 t backfilling ballast install,- 207 m shunting path produce.track drainage:- 617 m pipe trench produce,- 617 m partial seepage pipe DN 150 supply and install,- 19 pieces of flushing and control shafts supply and install DN 600 produce,- 21 pieces of seepage holes DN 400 produce. - deliver 1 250 pieces of concrete sleepers Bs 66 (alternative: B 70-2,4),- deliver 45 pieces of concrete sleepers b10003,- deliver 2 034 m rails S 49,- deliver 7 pieces of turnouts including long sleeper part,- deliver 2 053 t track ballast,- deliver 4 pieces of brake buffer blocks type 4. Equipment of 2 points with EOW technology. Both turnouts must be equipped with turnout drives as well as turnout position and order indicators. Operation is via 2 preferential control points. 5 axle counters are planned for the axle counters. The EOW controls will be installed in a weatherproof switch cabinet. Delivery and installation of point heating: Equipment of an IBW 49-300 and an EW 49-300 with point heating. The control unit will be controlled via a separate sensor station. The expected cable lengths of approx. 200 m (4 x 4 mm2) will be laid in new cable routes. Control and distribution are housed in an outdoor distribution cabinet. The number of luminaires is 43 x 100 W in single and double versions. The expected cable lengths of approx. 400 m (4 x 2.5 mm2) and approx. 640 m (4 x 4 mm2) are to be laid in new cable routes. The distribution of the track lighting will be installed together with the point heating in an outdoor distribution cabinet.
- Opportunity closing date
- 30 July 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- Erfurter Bahn GmbH Am Rasenrain 16 Erfurt 99086 Germany
- Contact
- vergabe@erfurter-bahn.de
The deadline to apply for this opportunity has passed.