Chile - Construction OF a soccer field in the lajuelas sector, commune OF San nicolÁs.

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
22 April 2024
Opportunity publication date
21 March 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

This project contemplates the installation of a synthetic grass surface, which will allow full use of the field throughout the year, considerably improving filtration and drying after rainfall. In addition to the above, a perimeter fence is considered to delimit the field and provide security to the sports facility.
Among the special characteristics of this alternative, the following stand out:

1. Installation of synthetic grass carpet with dimensions and characteristics in accordance with FIFA regulations in force, incorporating a rainwater disposal system by means of a drainage system.

2. Construction of a perimeter fence around the playing area, with a total area of approximately 5,225 m2 . As for the carpet, the installation of a 50 mm high monofilament synthetic grass with granulated rubber and silica area is considered. The upper level of the pitch will be at least 5 cm above the highest level of the surrounding natural terrain, all in accordance with the minimum design standards indicated in the FIFA Recommendations Manual.

Opportunity closing date
22 April 2024
Value of contract
to be confirmed

About the buyer

Address
I MUNICIPALIDAD DE SAN NICOLAS, I MUNICIPALIDAD DE SAN NICOLAS CHILE

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?