Germany - Building joinery installation work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
15 November 2022
Opportunity publication date
21 October 2022
Category
45420000: Jo
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

KPP - Centralization of the Clinic for Psychiatry and Psychotherapy in Lüneburg, carpentry work, new building component A and B The Psychiatric Clinic Lüneburg gemeinnützige GmbH is both a specialist hospital for psychiatry, psychotherapy and psychosomatics and a specialist clinic for child and adolescent psychiatry and psychotherapy as well as an academic teaching hospital of the University of Hamburg and the Georg August University of Göttingen and is planning the centralization of the Clinic for Psychiatry & Psychotherapy at the Lüneburg site.The following individual measures are part of this tender:Carpentry work DIN 18355
44 patient cupboard in standard room (2-bed), subdivided, incl. valuables compartments and suitcase compartment;4 patient cupboard in day clinic patients' lounge;8 patient cupboard in crisis room, subdivided, incl. valuables compartment and suitcase compartment;96 patient room wall niche as storage area / impact protection;96 magnetic wall / wall picture element / wall shelf in patient room, see color and material concept;8 magnetic wall in crisis room (for use as iso room, crisis patients: no magnets);48 magnetic wall in crisis room (for use as iso room, crisis patients: no magnets).48 pcs patient room wardrobe, wall protection element with two hooks / patient, hat shelf above;48 pcs patient room window seat, solid core material, HPL coated, 4-5cm thickness, d=45cm, with "backrest";8 pcs crisis room window seat, solid core material, HPL coated, 4-5cm thickness, d=45cm;366 m patient room side wall protection, HPL on support plate, with "backrest";366 m patient room side wall protection, HPL on support plate, with "backrest", with "backrest";366 m patient room side wall protection, HPL on support plate, with "backrest";366 m patient room side wall protection, HPL on support plate, with "backrest". HPL on support plate, flush with magnetic wall;53 pcs. shelf and towel holder in patient bathroom;4 pcs. shelf and towel holder in patient bathroom for day clinic patients;8 pcs. coat lock wall shelf with coat hooks;34 m. shelf in crisis room, 20cm wall extension with shelf console, HPL surface maple look;4 pcs. ward kitchen, incl. cooker, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher, dishwasher;4 pcs. 4 pcs. kitchenette (pantry) staff lounge;4 pcs. buffet counter dining room, HPL coated, open and closed compartments (lockable);4 pcs. room divider element between dining room and support point, incl. compartments and bench, transparent to the top;4 pcs. open ward counter nursing support point incl. storage compartments, visual appearance;4 pcs. 4 pcs. open nursing station counter incl. storage compartments, optical room closure to the traffic area ("Salo");4 pcs. rear enclosure of nursing station, wooden cladding as acoustic element;4 pcs. built-in wall of TV / recreation room;4 pcs. window bench / built-in bench in TV / recreation room;4 pcs. seating area in corridor niche, HPL surface, seat and back cushions;22 m. wooden privacy slats in front of glass walls between patients' recreation room and TV room;140 m2 of acoustic elements for patients' recreation room.Wall absorbers (subfloor with insulating insert, frame, textile covering);5 "bulletin boards" at ward entrances and main entrance;4 wall objects for address formation at ward entrances;16 storage areas in back office: shelves / compartments, l=1.80m;4 coat racks with valuables compartments in staff lounge;4 nursing combination workroom / modular cabinets, l=4.50m,4 nursing combination examination room ("Time Out") / modular cabinets, l=4.50m. ("Time Out") / modular cabinets, l= approx. 2.00m;4 pcs. wall shelf in the ward bathroom, HPL surface, damp room resistant, wall-mounted;4 pcs. storage cabinet for nursing utensils in the ward bathroom, d= approx. 80cm, l=3.25, room-high, lockable;1 pc. visitor room - built-in furniture under "technical stairs", wall and door cladding;28 pcs. doors to "sub-distribution niches" in corridors, T30 OTS, HPL-coated (motif print);16 m. built-in bench, firmly upholstered, corridor in front of doctors' rooms, 2 Stat. BT B, meeting room;1406 m impact protection plastic, h=1m d=2mm, in corridors & side rooms;155 pcs edge protection plastic, areas with bed / goods traffic;152 m impact protection HPL surface wood look, h=ca.1m, d=approx.1cm;536 m handrail hardwood (in corridors), diam. approx. 42mm;164 m handrail hardwood on staircase railing;1 pc landing installation GG area foyer stairs, A1, suicide prevention;1 pc landing installation "communication area", A1, seat step and bench at entrance new building;70 m window sills "normal" - HPL surface and edge;9 m window sills basement light shafts - HPL surface and edge;6 m window sills staircases - material non-combustible;70 m seat window sill on concrete parapet - solid core material, HPL coated, 4-5cm thickness, d=45cm;88 m seat window sill on pedestal console in front of P-R facades, solid core material, HPL coated, 4-5cm thickness, d=45cm;10 pcs seat window sill at corridor ends, solid core material, HPL coated, 4-5cm thickness, d=45cm;230 m skirting boards hardwood. painted;531 m ceiling reinforcement for curtain rails;

Opportunity closing date
15 November 2022
Value of contract
to be confirmed

About the buyer

Address
Psychiatrische Klinik Lüneburg gemeinnützige GmbH Am Wienebütteler Weg 1 Lüneburg 21339 Germany
Contact
ralph.wirth@gesundheitsholding-lueneburg.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?