France - Building construction works

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
01 October 2020
Opportunity publication date
02 September 2020
Category
45210000: Bu
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The present consultation concerns:- construction of a boarding school - rehabilitation of the J. Cocteau high school in Miramas (13);- construction of a boarding school in traditional wooden frame with straw filling (SDO built 1 047 m2 - surface of the complexes (walls, floors and roofs) in straw 1 800 m2);- rehabilitation of the day school by renovating the covered enclosure of buildings a, b, c, d, e, f and G, making the whole of the J. Cocteau high school in Miramas (13) accessible.
Renovation of the lycée:- complete removal of asbestos from the building;- renovation of the enclosed/covered buildings: renovation of the facade cladding, replacement of waterproofing;- demolition of certain volumes connecting buildings b, c and d;- major functional changes on the ground floor of Building B with the redesign of the lycée living space and its link with school life;- installation of a second lift. Construction of the boarding school:- construction of the boarding school infrastructure. Construction of the boarding school:- construction of the timber-framed walls (excluding interior linings), timber frame works, roofs/roofs and all exterior facings. Renovation of the school:- construction of footbridges (three) completely glazed to replace the demolished bastions;- installation of a covered gallery in the courtyard;- realization of works in locksmith's trade: fixed vertical and horizontal sunbreakers, fences with specific Jean Cocteau motifs. Renovation of the high school:- replacement of all the joinery of the building and installation of blackout systems (BSO/stores);- construction of the boarding school:- installation of aluminium wood joinery and blackout systems (BSO/stores). Renovation of the secondary school:- interior renovation of the buildings: rebuilding of floors, walls and ceilings;- major functional changes on the ground floor of Building B with the redesign of the secondary school living space and its link with school life;- functional changes on the floors of the buildings: removal of certain storage rooms, redesign and creation of some classrooms and straightening of traffic flows;- making all the existing buildings accessible.Construction of the boarding school:- completion of all finishing works;- construction of custom-made furniture and fittings in each living cell. Renovation of the high school:- installation of a simple flow ventilation system by insufflation and change of the VMC of the sanitary spaces;- repairs/modifications of the heating and plumbing installations.construction of the boarding school:- realization of all the HVAC/plumbing installations. Renovation of the high school:- repair of the high and low current networks of the buildings: replacement of the lighting and installation of a sound system in connection with the PPMS and the SSI;- realization of all the high and low current electrical installations. Renovation of the high school:- taking over of all the outside spaces;- construction of the boarding school:- installation of the connections and connections of the outside networks with the high school;- realization of all the outside spaces. Installation of photovoltaic panels on the roof.

Opportunity closing date
01 October 2020
Value of contract
to be confirmed

About the buyer

Address
Conseil régional Provence-Alpes-Côte d'Azur Pour Région Provence-Alpes-Côte d'Azur, 29 boulevard Charles Nedelec Marseille 13331 France
Contact
damj@arearegionsud.com

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?