France - Building construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
16 March 2020
Opportunity publication date
18 February 2020
Category
45210000: Building construction work
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

1) General descriptions:The aim of the CCU operation on RER line A is to bring RATP and SNCF teams closer together by offering the means to manage the line in close coordination, to allow technical tools to evolve, to provide staff with quality, modern, energy-efficient and environmentally friendly spaces.The R+3 building housing the CCU LA, with a usable area of approximately 2,200 m2 (SU), including 450 m2 for the operations room (the room that controls the RER A line), accommodating 40 people, will be built on the slab of the RATP car park forming the partial coverage of the tracks and platforms of RER line A, as well as 700 m2 of outdoor space. The future CCU LA will be built adjacent to the existing command post, which will be retained.It will have to offer a high operational availability of the hosted systems and services of 99.98% (i.e. a maximum of 1 hour 45 minutes of unavailability per year), an operating autonomy of 2 hours in the event of a blackout, be equipped with means of mechanical resistance to malicious acts of all kinds, a total active power of 140 kW, and a 24-hour security station (fire safety + malicious acts + technical building management);2) Detailed descriptions:For your information, this lot includes for the RER line A UCC operation, heavy current work, cabling, installation and connections:For a detailed description of the CFO/CFA work:- general and divisional low-voltage distribution boards,- 4 redundant uninterruptible power supplies,- associated batteries with 2 hours of autonomy,- Static Transfer Systems (STS),- an inverter dedicated to office automation,- lighting and room terminals,- CFO cabling,- CFA cabling for VDI, timing, video intercom and access control,- routing for CFO and CFA building.The building will have to comply with sustainable development requirements (environmental certification, acoustic constraints, low nuisance site, etc.),The building will be constructed in accordance with a BIM charter. Applicants' attention is drawn to the fact that the work will take place on a railway site that is kept in operation (organisational constraints and joint activities in particular).

Opportunity closing date
16 March 2020
Value of contract
to be confirmed

About the buyer

Address
RATP LAC B916 — 54 quai de la Rapée Paris Cedex 12 75599 France
Contact
elie.goncalves@ratp.fr

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?