Description

View Changes Site Visit Sign-in 
Attached is attendence Sign-in roster for site visit on 29 Aug 2024
--------------------------------------------------------------------------------------------------------------
AMENDMENT 0001 
Purpose is to change FAR 52.228-1 into full text and to provide revised drawing G-101 to show the change to the borrow area.
All other terms and conditions remain unchanged.

--------------------------------------------------------------------------------------------------------------------------
This requirement will be for stabilization of the Emergency Spillway upstream channel by excavation and shaping of the existing shoreline soil materials, installation of geotextile fabric, and the placement of riprap stone protection.The solicitation, specifications and drawings are provided below in the attachments section.
Details of the site visit on 29 August 2024 are listed within the solicitation.

Opportunity closing date
18 September 2024
Value of contract
to be confirmed

About the buyer

Address
W071 ENDIST OMAHA

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?