Description

ASG Spremberg GmbH as trustee, service provider and concessionaire of the Zweckverband Industriepark Schwarze Pumpe (ZV ISP) plans the revitalization of the development areas Quartier VI SN in the eastern area of the Industriepark Schwarze Pumpe. In preparation of a sustainable further development and exhaustion of the area potentials of the Industrial Park Schwarze Pumpe (ISP) and in order to be able to serve the needs of future investors, the demolition including deep debris removal of selected, abandoned buildings (old stock) will be necessary. In this context, running media lines must also be dismantled or relocated. The surrounding surfaces on the area under consideration will be unsealed and the existing underground formations of former buildings and foundations will be completely removed (complete deep debris removal). The same applies to above- and below-ground media formations and access roads. A pipe bridge route runs along the western border of the area under consideration. This will also be removed in the course of the construction work. In the following, the buildings, structures and open spaces to be considered are described and explained in more detail. It is intended to commission the planning services in the work steps / service phases 1 - 7 in stages. On the basis of the existing planning documents, the following engineering services are to be provided:The following services / work stages (part demolition and site clearance) are to be put out to tender:Work stage 1: Basic investigation and preliminary planning - determination of hazardous substances, preparation of disposal concept, hazardous substances reportWork stage 2: Design planning cost calculation - preparation of project substructures for the application procedure, construction and project descriptionWork stage 3: Approval planning - preparation of the submission of the demolition permit / demolition notice and participation in the application for nature conservation and environmental permitsWork step 4: Participation in the award of contract - preparation of the bill of quantities, participation in the implementation of the tender - implementation planningWork step 5: Local construction supervisionWork step 6: Construction management and demolition documentationWork step 7: Ecological construction supervisionThe following service phases (part media) are tendered:Engineering structures acc. to § 43 HOAI 2021

Opportunity closing date
03 November 2023
Value of contract
to be confirmed

About the buyer

Address
Zweckverband Industriepark Schwarze Pumpe (ZV ISP) vertreten durch die ASG Spremberg GmbH als Treuhänder An der Heide/ Straße A- Mitte 03130 Germany
Contact
info@asg-spremberg.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?