Poland - Architectural services for buildings

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
28 January 2020
Opportunity publication date
27 December 2019
Category
71221000: Architectural services for buildings
Value of contract
£0-100k
Your guide to exporting
Report opportunity

Description

Scope of the study: - insulation of above-ground and underground external walls together with insulation of foundation walls, - insulation of roofs, - partial replacement of old window and door joinery (including the liquidation of the luxuriators), - replacement of internal doors to the attic, - replacement of lightning protection system, - modernization of the heating substation, - replacement of central heating installation,- repair of basement skylights, - proper ventilation in the rooms by e.g. installation of wall or window ventilators (air vents) - to be agreed with the Orderer,- replacement of external window sills,- repair of chimneys and ventilation openings, plastering and painting works on chimneys to adjust their appearance to the facade,- reconstruction of stormwater drainage approaches associated with the removal of rain pipes and cleaners from the facade by the thickness of insulation and replacement of drain pipes and gutters,- reconstruction/renewal of canopies at the entrances (including over the main entrance),- execution of the canopy over the side entrance,- improvement of the aesthetics of the belt around the building after insulation of the walls,- repair of all elements associated with the building such as temporary disassembly and installation of devices/elements on the building's facades, e.g. sensor, lamps, boards,- flashings connected with facade insulation,- removal of rubble and waste to a landfill,- removal of all dismantled metal/steel elements, e.g.: dismantled lightning protection system, windowsills, metal sheets, pipes, gutters to a scrap yard,- repair/repair of stairs, renovation/replacement of window gratings, etc.The design documentation must consist of:- Building inventory in accordance with the PN-ISO 9836:1997 standard - 1 ex,- Energy audit - 1 ex,- Thermomodernization of the building (the scope of the design must be in accordance with the energy audit) - 4 ex,- Construction and executive design for the replacement of lightning protection system - electrical industry - 4 ex,- Construction and executive design for the replacement of the heating substation - 4 ex,- Construction and executive design for the replacement of central heating system. - 4 ex,- Technical specifications for the execution and acceptance of works, works' foreground, investor's cost estimates - 1 ex each,- Collective cost statement (amount of PLN net, VAT, gross) - 1 ex,- Energy characteristics designed together with an analysis of the possibility of rational use of alternative energy and heat supply systems - 4 ex. Scope of the study: - insulation of above-ground and underground external walls together with insulation of foundation walls, - insulation of roofs, - partial replacement of old windows and doors, - replacement of lightning protection system, - replacement of heat source (gas boiler to cascade of gas boilers) taking into account the heat demand of the Kindergarten building No. 18, which will be heated from a heat source located in the Primary School No. 16, - partial replacement of central heating installation,- repair of basement skylights, - proper ventilation in the rooms by e.g. installation of wall or window ventilators (air vents) - to be agreed with the Orderer,- replacement of external window sills,- repair of chimneys and ventilation openings, plaster and paint work on chimneys to adapt their appearance to the facade,- reconstruction of stormwater drainage approaches associated with the removal of rain pipes and cleaners from the facade by the thickness of insulation and replacement of drain pipes and gutters,- reconstruction / renovation of canopies at entrances (including over the main entrance),- execution of the roof over the side entrance,- improvement of the aesthetics of the belt around the building after insulation of the walls,- repair of all elements associated with the building eg. temporary disassembly and installation of devices/elements on the building's facades, e.g. sensor, lamps, boards,- flashings connected with facade insulation,- removal of rubble and waste to a landfill,- removal of all dismantled metal/steel elements, e.g.: dismantled lightning protection system, windowsills, metal sheets, pipes, gutters to a scrap yard,- repair/repair of stairs, renovation/replacement of window gratings, renovation of railings, etc.The design documentation must consist of: - Energy Audit - 1 ex,- Thermomodernization of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Construction and executive design for the replacement of lightning protection system - electrical industry - 4 ex,- Construction and executive design for the replacement of the gas boiler with new gas boilers (for SP16 and P-18) together with the internal gas installation (the study should include: part I, part II and part III of the design). construction, technological part, electrical part) - 4 ex.- 4 ex.- Construction and executive design of replacement of central heating installations. - 4 ex,- Technical specifications for the execution and acceptance of works, works' foreground, investor's cost estimates - 1 ex each,- Collective cost statement (amount of PLN net, VAT, gross) - 1 ex,- Energy characteristics designed together with an analysis of the possibility of rational use of alternative energy and heat supply systems - 4 ex. Scope of the study: - insulation of above-ground and underground external walls together with insulation of foundation walls, - insulation of roofs, - partial replacement of old windows and doors, - replacement of lightning protection system, - replacement of central heating installation,- repair of basement skylights, - proper ventilation in the rooms by e.g. installation of wall or window ventilators (air vents) - to be agreed with the Orderer,- mechanical ventilation of the gymnasium,- replacement of external window sills,- repair of chimneys and ventilation openings, plaster and paint work on chimneys to adjust their appearance to the facade,- reconstruction of stormwater drainage approaches associated with the removal of rain pipes and cleaners from the facade by the thickness of insulation and replacement of drain pipes and gutters,- reconstruction/renewal of canopies at the entrances (including over the main entrance),- execution of the canopy over the side entrance,- improvement of the aesthetics of the belt around the building after insulation of the walls,- repair of all elements associated with the building such as cornices, plinths, etc. and provide for all necessary works related to the insulation of the building, - temporary dismantling and installation of devices/elements on the facade of the building, e.g. sensor, lamps, boards, - flashings related to the insulation of the facade, - removal of rubble and waste to a landfill, - removal of all dismantled metal/steel elements e.g.: dismantled lightning protection system, windowsills, metal sheets, pipes, scrap metal gutters, - repair/repair of stairs, renovation/replacement of window gratings, renovation of railings, etc.B/ The design documentation must consist of: - Energy audit - 1 ex,- Thermomodernization of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Construction and executive design for the replacement of lightning protection system - electrical industry - 4 ex,- Construction and executive design for the replacement of central heating system. - 4 ex,- Technical specifications for the execution and acceptance of works, works' foreground, investor's cost estimates - 1 ex each,- Collective cost statement (amount of PLN net, VAT, gross) - 1 ex,- Energy characteristics designed together with an analysis of the possibility of rational use of alternative energy and heat supply systems - 4 ex. The scope of the study: - insulation of above-ground and underground external walls together with insulation of the foundation walls of the kindergarten building and the building adjacent to the kindergarten (teacher's house - flat),- insulation of the roof of the kindergarten building and the building adjacent to the kindergarten,- partial replacement of old windows and doors,- replacement of lightning protection system,- renovation/modernisation of the heat substation,- execution of proper ventilation in the rooms by e.g. installation of wall or window ventilators (air vents) - to be agreed with the Orderer,- replacement of external window sills,- repair of chimneys and ventilation openings, plastering and painting works on chimneys to adjust their appearance to the facade,- reconstruction of stormwater drainage approaches associated with the removal of rain pipes and cleaners from the facade by the thickness of insulation and replacement of drain pipes and gutters,- reconstruction / renovation of canopies at entrances (including over the main entrance),- execution of the roof over the side entrance,- improvement of the aesthetics of the belt around the building after insulation of the walls,- repair of all elements associated with the building eg. temporary disassembly and installation of devices/elements on the building's facades, e.g. sensor, lamps, boards, - flashings connected with facade insulation, - removal of rubble and waste to a landfill, - removal of all disassembled metal/steel elements, e.g.: dismantled lightning protection system, windowsills, metal sheets, pipes, scrap metal gutters, - repair/repair of stairs, renovation/replacement of window gratings, renovation of railings, etc.The design documentation must consist of: - Energy audit - 1 ex,- Building and executive design for thermal upgrading of the building (the scope of the design must be consistent with the energy audit) - 4 ex,- Building and executive design for replacement of lightning protection system - electrical industry - 4 ex,- Building and executive design for replacement of central heating system. - 4 ex,- Construction and executive design for the replacement of a heat substation - 4 ex,- Technical specifications for the execution and acceptance of works, work measurements, investor's cost estimates - 1 ex each,- Collective cost statement (amount of PLN net, VAT, gross) - 1 ex,- Designed energy performance together with an analysis of the possibility of rational use of alternative energy and heat supply systems - 4 ex.

Opportunity closing date
28 January 2020
Value of contract
£0-100k

About the buyer

Address
Miasto Rybnik ul. Bolesława Chrobrego 2 Rybnik 44-200 Poland
Contact
rybnik@um.rybnik.pl

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?