United States - A-10 AFT Cowlings RH (5 YR IDIQ)

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
12 March 2024
Opportunity publication date
11 January 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

View Changes 11JAN2024: Attached is Q&A Round 5.
19DEC2023: Attached is Q&A Round 4 and Amendment 0004.
13DEC2023: Attached Q&A Round 3.  
11DEC2023: Attached Q&A Round 2_Clarification on 5% SDB Applies to Individual Plans (not Master Plans)_Next RFP amendment will include this clarification.  
8DEC2023: Attached Q&A Round 1_08DEC2023.
4DEC2023: Attached LPTA NOT Authorized Clarification_4DEC2023.pdf.
30NOV2023: Attached RFP Amendment 003 with updated SECTION L&M
30NOV2023: The Site Visit Q and A has been updated to require utilizing the master tooling for the production of the First Article.
27NOV2023: The Site Visit Q and A from the 14NOV2023 AMARG site visit has been updated. 
21NOV2023: The Site Visit Q and A from the 14 NOV 2023 AMARG site visit has been attached. 
17NOV2023: A new version of the AMARG Site Visit Attendess List v2 that identifies the small business manufacturers has been uploaded.
16NOV2023: Attached is the site visit attendee list for the site visit on 14Nov2023. In addition, Site Visit Master Tooling Pictures are also attached. Please note the Government is not liable for any inadequacies in the pictures.
19OCT2023: Amendment 0002 has been posted. RFP has not been extended. Amendment 0002 provides drawings of the Tail Cone Master Tooling. In addition, the modeling group has been revising and verifying the 3D models listed in the EDL. These models will be validated and released by contract award. The current models provided have minor errors related to geometry but do not affect the contractor’s ability to provide an accurate quote.
16OCT2023: Please review Amendment 0001 in its entirety and please email the PCO if you have any questions. The solicitation has been amended to add Master tooling as GFP. In addition, The USAF has scheduled a site visit to allow vendors to physically inspect the Master tooling at the AMARG on Tuesday November 14 2023 starting at 0830 local time. The details are in Amendment 0001. Please let me know if your firm is bidding on the RH and LH Aft Cowlings and if your firm is attending the site visit no later than (NLT) Friday October 27, 2023. This will be the only site visit to inspect the Master tooling. Please note, the drawings/specs for the casting house for the RH Aft Cowling and LH Aft Cowling are nearly the same. The drawings for the casting house for the LH Aft Cowling have been provided in the solicitation for bidding purposes. The drawings for the RH Aft Cowlings for the casting house will be provided by contract award.
14SEP2023: Solicitation is posted for 120 Days. Please note, the models for the casting house are listed in the SECTION J of the solicitation however, they could not be attached to this notice (Attach_24_160D413024-11_D-ADAPTER CASTING.stp and Attach_25_160D413029-11_C-ADAPTER_FITTING.stp).  Please e-mail the PCO for access to the drawings posted in this notice and the rest of the TDP listed in SECTION J as ZIP FILES.

Opportunity closing date
12 March 2024
Value of contract
to be confirmed

About the buyer

Address
FA8212 AFSC PZABA UNITED STATES
Contact
leslie.evans.1@us.af.mil

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?